Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Frozen Vegetables
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 193
Plant Area (Sq.Ft.) 311,000
Annual Production 150,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $716,741 20,287,360 kWh $0.04
Electricity Demand $219,800 49,010 kW-months/year $4.48
Electricity Fees $19,157 - $ -
Natural Gas $167,716 32,786 MMBtu $5.12
TOTAL ENERGY COSTS $1,123,414
RECOMMENDED SAVINGS* $61,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$4,500
Cost:
$10,500
$4,500 143,400 - - - - - - $4,500
143,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$9,750
Cost:
$300
$9,750 309,400 - - - - - - $9,750
309,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,820
Cost:
$36,600
$4,200 133,000 $620 156 - - - - $4,200
133,000
kWh
$620
156
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$34,250
Cost:
$2,000
$27,400 874,000 $6,850 1,716 - - - - $27,400
874,000
kWh
$6,850
1,716
kW-months/year
-
-
$
-
-
MMBtu
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$5,330
Cost:
$2,825
- - - - - - $5,330 1,160 -
-
kWh
-
-
kW-months/year
-
-
$
$5,330
1,160
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,730
Cost:
$5,130
- - - - $2,730 - - - -
-
kWh
-
-
kW-months/year
$2,730
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$61,380
Cost:
$57,355
$45,850 1,459,800 $7,470 1,872 $2,730 - $5,330 1,160 $45,850
1,459,800
kWh
$7,470
1,872
kW-months/year
$2,730
-
$
$5,330
1,160
MMBtu
TOTAL IMPLEMENTED Savings:
$56,880
Cost:
$46,855
$41,350 1,316,400 $7,470 1,872 $2,730 - $5,330 1,160 $41,350
1,316,400
kWh
$7,470
1,872
kW-months/year
$2,730
-
$
$5,330
1,160
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas