IAC logo
IAC Assessment: OR0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Molded Plastic Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 40,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 8,568
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,383 3,013,800 kWh $0.05
Electricity Demand $34,290 80,484 kW-months/year $0.43
Electricity Fees $1,398 - $ -
Natural Gas $8,042 944 MMBtu $8.52
TOTAL ENERGY COSTS $210,968
RECOMMENDED SAVINGS* $67,720 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,220
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,300
Cost:
$1,500
$1,100 21,500 $200 36 - - - - $1,100
21,500
kWh
$200
36
kW-months/year
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,070
Cost:
$1,830
$4,320 82,800 $750 144 - - - - $4,320
82,800
kWh
$750
144
kW-months/year
-
-
$
-
-
$
03: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$16,000
Cost:
-
- - - - - - $16,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$16,000
-
$
04: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$37,500
Cost:
$14,200
- - - - $37,500 - - - -
-
kWh
-
-
kW-months/year
$37,500
-
$
-
-
$
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$7,850
Cost:
$2,320
- - - - $7,850 - - - -
-
kWh
-
-
kW-months/year
$7,850
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$67,720
Cost:
$19,850
$5,420 104,300 $950 180 $45,350 - $16,000 - $5,420
104,300
kWh
$950
180
kW-months/year
$45,350
-
$
$16,000
-
$
TOTAL IMPLEMENTED Savings:
$30,220
Cost:
$5,650
$5,420 104,300 $950 180 $7,850 - $16,000 - $5,420
104,300
kWh
$950
180
kW-months/year
$7,850
-
$
$16,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product