IAC logo
IAC Assessment: OR0464
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0464
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 350,000
Annual Production 64,990,000 Thousand Feet
Production Hrs. Annual 2,783
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,180 3,209,470 kWh $0.05
Electricity Demand $34,710 146,880 kW-months/year $0.24
Electricity Fees $2,282 - $ -
TOTAL ENERGY COSTS $198,172
RECOMMENDED SAVINGS* $94,055 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,350
Cost:
$1,350
$1,150 23,000 $200 7 - - - - $1,150
23,000
kWh
$200
7
kW-months/year
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,200
Cost:
-
$4,470 89,000 $730 22 - - - - $4,470
89,000
kWh
$730
22
kW-months/year
-
-
$
-
-
$
03: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$35,405
Cost:
$42,000
$(-123) (-3,530) $(-272) (-9) $35,800 - - - $(-123)
(-3,530)
kWh
$(-272)
(-9)
kW-months/year
$35,800
-
$
-
-
$
04: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$44,800
Cost:
$170
- - - - $16,900 - $27,900 - -
-
kWh
-
-
kW-months/year
$16,900
-
$
$27,900
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,300
Cost:
$6,900
$2,700 52,900 $600 20 - - - - $2,700
52,900
kWh
$600
20
kW-months/year
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,000
Cost:
$800
$4,000 79,820 - - - - - - $4,000
79,820
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$94,055
Cost:
$51,220
$12,197 241,190 $1,258 39 $52,700 - $27,900 - $12,197
241,190
kWh
$1,258
39
kW-months/year
$52,700
-
$
$27,900
-
$
TOTAL IMPLEMENTED Savings:
$54,650
Cost:
$8,420
$8,320 164,900 $1,530 49 $16,900 - $27,900 - $8,320
164,900
kWh
$1,530
49
kW-months/year
$16,900
-
$
$27,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product