IAC Assessment: OR0469
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0469
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Door & Window Frame Parts
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 500,000
Annual Production 10,200 Pieces
Production Hrs. Annual 4,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,910 6,461,600 kWh $0.04
Electricity Demand $69,975 237,204 kW-months/year $0.29
Electricity Fees $20,026 - $ -
Natural Gas $79,585 10,390 MMBtu $7.66
LPG $27,443 2,262 MMBtu $12.13
Fuel Oil #2 $5,942 660 MMBtu $9.01
TOTAL ENERGY COSTS $452,471
RECOMMENDED SAVINGS* $54,610 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,100
Cost:
$2,000
$6,600 183,000 $500 124 - - $6,600
183,000
kWh
$500
124
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,200
Cost:
-
$3,100 85,000 $100 23 - - $3,100
85,000
kWh
$100
23
kW-months/year
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,830
Cost:
$885
$8,070 223,000 $760 18 - - $8,070
223,000
kWh
$760
18
kW-months/year
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,500
Cost:
$4,500
$5,500 151,000 - - - - $5,500
151,000
kWh
-
-
kW-months/year
-
-
$
05: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$2,600
Cost:
$2,300
$2,600 71,200 - - - - $2,600
71,200
kWh
-
-
kW-months/year
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,000
Cost:
$14,620
$8,000 219,400 $3,000 69 - - $8,000
219,400
kWh
$3,000
69
kW-months/year
-
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,770
Cost:
$31,500
$9,010 249,000 $2,760 65 - - $9,010
249,000
kWh
$2,760
65
kW-months/year
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,610
Cost:
$14,750
- - - - $4,610 - -
-
kWh
-
-
kW-months/year
$4,610
-
$
TOTAL RECOMMENDED Savings:
$54,610
Cost:
$70,555
$42,880 1,181,600 $7,120 299 $4,610 - $42,880
1,181,600
kWh
$7,120
299
kW-months/year
$4,610
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees