IAC logo
IAC Assessment: OR0472
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0472
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2004
Principal Product Asphalt, Asphalt Emulsions
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 6
Plant Area (Sq.Ft.) 8,600
Annual Production 78,800,000 Pounds
Production Hrs. Annual 4,368
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,345 1,075,177 kWh $0.04
Electricity Demand $16,345 2,945 kW-months/year $5.55
Electricity Fees $3,769 - $ -
Natural Gas $451,154 619,123 MMBtu $0.73
TOTAL ENERGY COSTS $510,613
RECOMMENDED SAVINGS* $43,173 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,173
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$20,400
Cost:
$3,200
- - - - $20,400 2,800 -
-
kWh
-
-
kW-months/year
$20,400
2,800
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,100
Cost:
$3,300
$1,800 48,700 $1,300 19 - - $1,800
48,700
kWh
$1,300
19
kW-months/year
-
-
MMBtu
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$5,173
Cost:
$2,000
- - - - $5,173 710 -
-
kWh
-
-
kW-months/year
$5,173
710
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,500
Cost:
$38,000
- - - - $14,500 1,988 -
-
kWh
-
-
kW-months/year
$14,500
1,988
MMBtu
TOTAL RECOMMENDED Savings:
$43,173
Cost:
$46,500
$1,800 48,700 $1,300 19 $40,073 5,498 $1,800
48,700
kWh
$1,300
19
kW-months/year
$40,073
5,498
MMBtu
TOTAL IMPLEMENTED Savings:
$43,173
Cost:
$46,500
$1,800 48,700 $1,300 19 $40,073 5,498 $1,800
48,700
kWh
$1,300
19
kW-months/year
$40,073
5,498
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas