Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2005 |
Principal Product | stud and dimensioned lumber |
NAICS | 321219 - Reconstituted Wood Product Manufacturing |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $50,000,000-$100,000,000 |
# of Employees | 230 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 135,000 Thousand Feet |
Production Hrs. Annual | 8,400 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,677,620 | 37,812,096 | kWh | $0.04 |
Electricity Demand | $303,169 | 70,178 | kW-months/year | $4.32 |
Electricity Fees | $1,119 | - | $ | - |
Fuel Oil #6 | $215,630 | 32,714 | MMBtu | $6.59 |
TOTAL ENERGY COSTS | $2,335,928 | |||
RECOMMENDED SAVINGS* | $187,525 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Wood | Electricity Usage | Electricity Demand | Electricity Fees | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,420 Cost: $6,500 |
$6,310 | 142,227 | $110 | 26 | - | - | - | - |
$6,310 142,227 kWh |
$110 26 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $19,180 Cost: - |
$18,852 | 424,882 | $328 | 76 | - | - | - | - |
$18,852 424,882 kWh |
$328 76 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $6,760 Cost: $15,400 |
$6,685 | 150,600 | $75 | 17 | - | - | - | - |
$6,685 150,600 kWh |
$75 17 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $64,700 Cost: $19,500 |
- | - | - | - | - | - | $64,700 | 43,120 |
- - kWh |
- - kW-months/year |
- - $ |
$64,700 43,120 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $13,480 Cost: $12,250 |
- | - | - | - | $13,480 | - | - | - |
- - kWh |
- - kW-months/year |
$13,480 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $12,250 Cost: - |
$12,250 | 113,800 | - | - | - | - | - | - |
$12,250 113,800 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $64,000 Cost: $134,000 |
$53,000 | 1,195,000 | $11,000 | 203 | - | - | - | - |
$53,000 1,195,000 kWh |
$11,000 203 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $735 Cost: $2,410 |
- | - | - | - | - | - | $735 | 490 |
- - kWh |
- - kW-months/year |
- - $ |
$735 490 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $187,525 Cost: $190,060 |
$97,097 | 2,026,509 | $11,513 | 322 | $13,480 | - | $65,435 | 43,610 | $97,097 2,026,509 kWh |
$11,513 322 kW-months/year |
$13,480 - $ |
$65,435 43,610 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Wood | Electricity Usage | Electricity Demand | Electricity Fees | Wood |