IAC logo
IAC Assessment: OR0485
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0485
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product stud and dimensioned lumber
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2421 - Sawmills And Planing Mills, General
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 150,000
Annual Production 135,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,677,620 37,812,096 kWh $0.04
Electricity Demand $303,169 70,178 kW-months/year $4.32
Electricity Fees $1,119 - $ -
Fuel Oil #6 $215,630 32,714 MMBtu $6.59
TOTAL ENERGY COSTS $2,335,928
RECOMMENDED SAVINGS* $187,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,420
Cost:
$6,500
$6,310 142,227 $110 26 - - - - $6,310
142,227
kWh
$110
26
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$19,180
Cost:
-
$18,852 424,882 $328 76 - - - - $18,852
424,882
kWh
$328
76
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$6,760
Cost:
$15,400
$6,685 150,600 $75 17 - - - - $6,685
150,600
kWh
$75
17
kW-months/year
-
-
$
-
-
MMBtu
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$64,700
Cost:
$19,500
- - - - - - $64,700 43,120 -
-
kWh
-
-
kW-months/year
-
-
$
$64,700
43,120
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,480
Cost:
$12,250
- - - - $13,480 - - - -
-
kWh
-
-
kW-months/year
$13,480
-
$
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,250
Cost:
-
$12,250 113,800 - - - - - - $12,250
113,800
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$64,000
Cost:
$134,000
$53,000 1,195,000 $11,000 203 - - - - $53,000
1,195,000
kWh
$11,000
203
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$735
Cost:
$2,410
- - - - - - $735 490 -
-
kWh
-
-
kW-months/year
-
-
$
$735
490
MMBtu
TOTAL RECOMMENDED Savings:
$187,525
Cost:
$190,060
$97,097 2,026,509 $11,513 322 $13,480 - $65,435 43,610 $97,097
2,026,509
kWh
$11,513
322
kW-months/year
$13,480
-
$
$65,435
43,610
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood