IAC Assessment: OR0491
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0491
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Fruit Filling and Sweeteners
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 33
Plant Area (Sq.Ft.) 50,300
Annual Production 26,000,000 Pounds
Production Hrs. Annual 2,500
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,850 909,640 kWh $0.06
Electricity Demand $3,029 2,941 kW-months/year $1.03
Electricity Fees $718 - $ -
Natural Gas $69,735 75,134 MMBtu $0.93
TOTAL ENERGY COSTS $155,577
RECOMMENDED SAVINGS* $65,380 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $
01: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$22,340
Cost:
-
- - - - - - - - - - $22,340 160 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$22,340
160
lb
-
-
$
-
-
$
02: 3.7211 MODIFY MATERIAL APPLICATION METHODS Savings:
$17,000
Cost:
$7,200
- - - - - - - - - - - - - - $17,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$17,000
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,000
Cost:
$7,200
- - - - - - $14,000 15,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,000
15,000
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1,180
Cost:
$1,000
- - - - - - $1,180 1,260 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,180
1,260
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$730
Cost:
$1,300
- - - - - - - - $730 80 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$730
80
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,440
Cost:
$1,900
$1,660 28,000 - - - - - - - - - - $230 - $550 - $1,660
28,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
$230
-
$
$550
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,040
Cost:
$10,650
$6,880 119,000 $160 13 - - - - - - - - - - - - $6,880
119,000
kWh
$160
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$650
Cost:
$1,800
- - - - $650 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$650
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,380
Cost:
$31,050
$8,540 147,000 $160 13 $650 - $15,180 16,260 $730 80 $22,340 160 $230 - $17,550 - $8,540
147,000
kWh
$160
13
kW-months/year
$650
-
$
$15,180
16,260
MMBtu
$730
80
MMBtu
$22,340
160
lb
$230
-
$
$17,550
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material