IAC logo
IAC Assessment: OR0493
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0493
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2005
Principal Product Coffee Beans
NAICS 311911 - Roasted Nuts and Peanut Butter Manufacturing
SIC 2095 - Roasted Coffee
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 125,000
Annual Production 6,500,000 Pounds
Production Hrs. Annual 3,625
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,289 832,480 kWh $0.06
Electricity Demand $7,643 1,644 kW-months/year $4.65
Electricity Fees $240 - $ -
Natural Gas $168,665 21,736 MMBtu $7.76
TOTAL ENERGY COSTS $227,837
RECOMMENDED SAVINGS* $97,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$66,200
Cost:
$1,000
- - - - - - - - - - $66,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$66,200
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,900
Cost:
$1,900
$3,000 49,300 $650 131 - - - - $2,250 - - - $3,000
49,300
kWh
$650
131
kW-months/year
-
-
MMBtu
-
-
$
$2,250
-
$
-
-
$
03: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$5,400
Cost:
$1,000
- - - - - - $5,400 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,400
-
$
-
-
$
-
-
$
04: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$11,000
Cost:
$13,000
- - - - $11,000 1,500 - - - - - - -
-
kWh
-
-
kW-months/year
$11,000
1,500
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,400
Cost:
$2,500
$2,115 34,600 $285 58 - - - - - - - - $2,115
34,600
kWh
$285
58
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,500
Cost:
-
$1,300 21,000 $200 46 - - - - - - - - $1,300
21,000
kWh
$200
46
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,400
Cost:
$3,600
$1,400 22,950 - - - - - - $1,000 - - - $1,400
22,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,000
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,900
Cost:
$17,000
- - - - $2,900 400 - - - - - - -
-
kWh
-
-
kW-months/year
$2,900
400
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$97,700
Cost:
$40,000
$7,815 127,850 $1,135 235 $13,900 1,900 $5,400 - $3,250 - $66,200 - $7,815
127,850
kWh
$1,135
235
kW-months/year
$13,900
1,900
MMBtu
$5,400
-
$
$3,250
-
$
$66,200
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product