IAC logo
IAC Assessment: OR0496
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Plywood
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 115,000
Annual Production 207,000 Thousand Feet
Production Hrs. Annual 7,800
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,820,384 47,616,626 kWh $0.04
Electricity Fees $261,099 - $ -
Natural Gas $47,569 5,766 MMBtu $8.25
TOTAL ENERGY COSTS $2,129,052
RECOMMENDED SAVINGS* $1,337,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $586,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ %
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$689,000
Cost:
$213,000
- - - - - - - - - - - - $689,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
$689,000
-
%
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$282,000
Cost:
$212,000
- - - - - - - - - - $(-20,000) - $302,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-20,000)
-
$
$302,000
-
%
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$201,300
Cost:
$301,500
$185,900 4,866,000 $15,400 627 - - - - - - - - - - $185,900
4,866,000
kWh
$15,400
627
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$66,800
Cost:
$118,000
$24,000 706,600 $1,800 987 - - $41,000 65,900 - - - - - - $24,000
706,600
kWh
$1,800
987
kW-months/year
-
-
$
$41,000
65,900
MMBtu
-
-
$
-
-
$
-
-
%
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$51,400
Cost:
$28,000
- - - - $51,400 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$51,400
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$33,700
Cost:
$91,000
$31,000 820,000 $2,700 110 - - - - - - - - - - $31,000
820,000
kWh
$2,700
110
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,030
Cost:
$2,000
$8,030 2,011,000 - - - - - - - - - - - - $8,030
2,011,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,400
Cost:
$900
$1,600 42,500 $200 116 - - - - $600 - - - - - $1,600
42,500
kWh
$200
116
kW-months/year
-
-
$
-
-
MMBtu
$600
-
$
-
-
$
-
-
%
09: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,425
Cost:
-
$1,300 33,950 $125 5 - - - - - - - - - - $1,300
33,950
kWh
$125
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$780
Cost:
$295
$780 20,500 - - - - - - - - - - - - $780
20,500
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
11: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$415
Cost:
$600
$390 11,000 $25 1 - - - - - - - - - - $390
11,000
kWh
$25
1
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,337,250
Cost:
$967,295
$253,000 8,511,550 $20,250 1,846 $51,400 - $41,000 65,900 $600 - $(-20,000) - $991,000 - $253,000
8,511,550
kWh
$20,250
1,846
kW-months/year
$51,400
-
$
$41,000
65,900
MMBtu
$600
-
$
$(-20,000)
-
$
$991,000
-
%
TOTAL IMPLEMENTED Savings:
$586,200
Cost:
$723,400
$242,500 6,435,100 $20,100 1,840 - - $41,000 65,900 $600 - $(-20,000) - $302,000 - $242,500
6,435,100
kWh
$20,100
1,840
kW-months/year
-
-
$
$41,000
65,900
MMBtu
$600
-
$
$(-20,000)
-
$
$302,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Electricity Fees Wood Personnel Changes One-time Revenue or Avoided Cost Increase in Production