IAC Assessment: OR0502
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Dimensional Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 1,742,400
Annual Production 55,000,000 Units
Production Hrs. Annual 4,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,000 8,001,748 kWh $0.03
Electricity Demand $123,180 27,323 kW-months/year $4.51
Electricity Fees $15 - $ -
Natural Gas $201,943 235,083 MMBtu $0.86
TOTAL ENERGY COSTS $600,138
RECOMMENDED SAVINGS* $5,109,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Increase in Production Electricity Usage Electricity Demand Electricity Fees Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 4.453 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION Savings:
$5,052,000
Cost:
-
- - - - - - $5,052,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$5,052,000
-
%
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$5,700
Cost:
-
$5,700 160,000 - - - - - - $5,700
160,000
kWh
-
-
kW-months/year
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,300
Cost:
$6,300
$5,100 143,000 $1,200 22 - - - - $5,100
143,000
kWh
$1,200
22
kW-months/year
-
-
$
-
-
%
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$18,300
Cost:
$27,500
$16,000 447 $2,300 45 - - - - $16,000
447
kWh
$2,300
45
kW-months/year
-
-
$
-
-
%
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,600
Cost:
$48,600
- - - - $12,600 - - - -
-
kWh
-
-
kW-months/year
$12,600
-
$
-
-
%
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,280
Cost:
$72,900
$10,300 288,290 $3,980 77 - - - - $10,300
288,290
kWh
$3,980
77
kW-months/year
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$5,109,180
Cost:
$155,300
$37,100 591,737 $7,480 144 $12,600 - $5,052,000 - $37,100
591,737
kWh
$7,480
144
kW-months/year
$12,600
-
$
$5,052,000
-
%
TOTAL IMPLEMENTED Savings:
$57,180
Cost:
$155,300
$37,100 591,737 $7,480 144 $12,600 - - - $37,100
591,737
kWh
$7,480
144
kW-months/year
$12,600
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Increase in Production Electricity Usage Electricity Demand Electricity Fees Increase in Production