IAC logo
IAC Assessment: OR0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2006
Principal Product Air Craft Flooring, Air Craft Ducting
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 340
Plant Area (Sq.Ft.) 380,000
Annual Production 630,000 Pieces
Production Hrs. Annual 4,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $508,833 12,111,652 kWh $0.04
Electricity Demand $96,957 399,468 kW-months/year $0.24
Natural Gas $303,925 40,574 MMBtu $7.49
TOTAL ENERGY COSTS $909,715
RECOMMENDED SAVINGS* $151,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,300
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$100,600
Cost:
$5,500
$50,400 1,320,000 - - $50,200 6,700 $50,400
1,320,000
kWh
-
-
kW-months/year
$50,200
6,700
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$32,700
Cost:
$20,600
- - - - $32,700 3,830 -
-
kWh
-
-
kW-months/year
$32,700
3,830
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,000
Cost:
$5,000
- - - - $7,000 900 -
-
kWh
-
-
kW-months/year
$7,000
900
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,300
Cost:
$5,000
- - - - $6,300 740 -
-
kWh
-
-
kW-months/year
$6,300
740
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,400
Cost:
$7,500
$4,050 101,000 $350 120 - - $4,050
101,000
kWh
$350
120
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$151,000
Cost:
$43,600
$54,450 1,421,000 $350 120 $96,200 12,170 $54,450
1,421,000
kWh
$350
120
kW-months/year
$96,200
12,170
MMBtu
TOTAL IMPLEMENTED Savings:
$118,300
Cost:
$23,000
$54,450 1,421,000 $350 120 $63,500 8,340 $54,450
1,421,000
kWh
$350
120
kW-months/year
$63,500
8,340
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas