IAC logo
IAC Assessment: OR0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product fruit and candy
NAICS 311352 - Confectionery Manufacturing from Purchased Chocolate
SIC 2064 - Candy & Other Confectionery Products
Sales $5,000,000-$10,000,000
# of Employees 500
Plant Area (Sq.Ft.) 50,000
Annual Production 500,000 Pounds
Production Hrs. Annual 5,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,273,652 28,350,000 kWh $0.04
Electricity Demand $214,229 90,000 kW-months/year $2.38
Natural Gas $512,036 54,857 MMBtu $9.33
TOTAL ENERGY COSTS $1,999,917
RECOMMENDED SAVINGS* $82,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,400
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Raw Material Electricity Usage Natural Gas Primary Raw Material
$ kWh $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$33,600
Cost:
$32,500
- - - - $33,600 - -
-
kWh
-
-
MMBtu
$33,600
-
$
02: 2.329 Savings:
$15,400
Cost:
-
$15,400 418,300 - - - - $15,400
418,300
kWh
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,700
Cost:
$31,650
$11,700 195,700 - - - - $11,700
195,700
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,600
Cost:
$17,550
$8,600 171,500 - - - - $8,600
171,500
kWh
-
-
MMBtu
-
-
$
05: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$4,800
Cost:
$6,400
- - $4,800 570 - - -
-
kWh
$4,800
570
MMBtu
-
-
$
06: 2.1224 REPLACE BOILER Savings:
$4,900
Cost:
$5,250
- - $4,900 530 - - -
-
kWh
$4,900
530
MMBtu
-
-
$
07: 2.2123 INSULATE FEEDWATER TANK Savings:
$3,400
Cost:
$2,160
- - $3,400 469 - - -
-
kWh
$3,400
469
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$82,400
Cost:
$95,510
$35,700 785,500 $13,100 1,569 $33,600 - $35,700
785,500
kWh
$13,100
1,569
MMBtu
$33,600
-
$
TOTAL IMPLEMENTED Savings:
$82,400
Cost:
$95,510
$35,700 785,500 $13,100 1,569 $33,600 - $35,700
785,500
kWh
$13,100
1,569
MMBtu
$33,600
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Raw Material Electricity Usage Natural Gas Primary Raw Material