IAC Assessment: OR0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product Ammunition
NAICS 332993 - Ammunition (except Small Arms) Manufacturing
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $100,000,000-$500,000,000
# of Employees 932
Plant Area (Sq.Ft.) 317,940
Annual Production 70,500,000 Pieces
Production Hrs. Annual 8,760
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $872,043 25,258,187 kWh $0.03
Electricity Demand $101,740 37,708 kW-months/year $2.70
Natural Gas $363,044 37,743 MMBtu $9.62
TOTAL ENERGY COSTS $1,336,827
RECOMMENDED SAVINGS* $1,466,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,220
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Raw Material Increase in Production Electricity Usage Natural Gas Primary Raw Material Increase in Production
$ kWh $ MMBtu $ $ $ %
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$35,000
Cost:
$60,000
- - - - $35,000 - - - -
-
kWh
-
-
MMBtu
$35,000
-
$
-
-
%
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$77,000
Cost:
$5,000
- - $77,000 8,000 - - - - -
-
kWh
$77,000
8,000
MMBtu
-
-
$
-
-
%
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,350,000
Cost:
$32,700
- - - - - - $1,350,000 - -
-
kWh
-
-
MMBtu
-
-
$
$1,350,000
-
%
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,220
Cost:
$1,160
- - $1,220 117 - - - - -
-
kWh
$1,220
117
MMBtu
-
-
$
-
-
%
05: 2.2514 COVER OPEN TANKS Savings:
$3,000
Cost:
$9,000
$3,000 84,900 - - - - - - $3,000
84,900
kWh
-
-
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,466,220
Cost:
$107,860
$3,000 84,900 $78,220 8,117 $35,000 - $1,350,000 - $3,000
84,900
kWh
$78,220
8,117
MMBtu
$35,000
-
$
$1,350,000
-
%
TOTAL IMPLEMENTED Savings:
$36,220
Cost:
$61,160
- - $1,220 117 $35,000 - - - -
-
kWh
$1,220
117
MMBtu
$35,000
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ $ $ %
Electricity Usage Natural Gas Primary Raw Material Increase in Production Electricity Usage Natural Gas Primary Raw Material Increase in Production