Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2007 |
Principal Product | Ammunition |
NAICS | 332993 - Ammunition (except Small Arms) Manufacturing |
SIC | 3483 - Ammunition, Exc. For Small Arms, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 932 |
Plant Area (Sq.Ft.) | 317,940 |
Annual Production | 70,500,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $872,043 | 25,258,187 | kWh | $0.03 |
Electricity Demand | $101,740 | 37,708 | kW-months/year | $2.70 |
Natural Gas | $363,044 | 37,743 | MMBtu | $9.62 |
TOTAL ENERGY COSTS | $1,336,827 | |||
RECOMMENDED SAVINGS* | $1,466,220 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,220 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Raw Material | Increase in Production | Electricity Usage | Natural Gas | Primary Raw Material | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $35,000 Cost: $60,000 |
- | - | - | - | $35,000 | - | - | - |
- - kWh |
- - MMBtu |
$35,000 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $77,000 Cost: $5,000 |
- | - | $77,000 | 8,000 | - | - | - | - |
- - kWh |
$77,000 8,000 MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,350,000 Cost: $32,700 |
- | - | - | - | - | - | $1,350,000 | - |
- - kWh |
- - MMBtu |
- - $ |
$1,350,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,220 Cost: $1,160 |
- | - | $1,220 | 117 | - | - | - | - |
- - kWh |
$1,220 117 MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2514 COVER OPEN TANKS |
Savings: $3,000 Cost: $9,000 |
$3,000 | 84,900 | - | - | - | - | - | - |
$3,000 84,900 kWh |
- - MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,466,220 Cost: $107,860 |
$3,000 | 84,900 | $78,220 | 8,117 | $35,000 | - | $1,350,000 | - | $3,000 84,900 kWh |
$78,220 8,117 MMBtu |
$35,000 - $ |
$1,350,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,220 Cost: $61,160 |
- | - | $1,220 | 117 | $35,000 | - | - | - | - - kWh |
$1,220 117 MMBtu |
$35,000 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Raw Material | Increase in Production | Electricity Usage | Natural Gas | Primary Raw Material | Increase in Production |