Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2007
Principal Product Ceramic Tiles
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3253 - Ceramic Wall And Floor Tile
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 1,800 Thousand Feet
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,221 2,729,960 kWh $0.06
Electricity Demand $28,467 8,688 kW-months/year $3.28
Electricity Fees $12,038 - $ -
Natural Gas $369,204 41,200 MMBtu $8.96
TOTAL ENERGY COSTS $569,930
RECOMMENDED SAVINGS* $634,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 4.126 INSTALL SENSORS TO DETECT DEFECTS Savings:
$371,000
Cost:
$1,113,000
- - - - - - - - $371,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$371,000
-
%
02: 4.426 MODIFY WORKLOAD Savings:
$162,000
Cost:
$23,000
- - - - - - - - $162,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$162,000
-
%
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$70,000
Cost:
$48,000
- - - - $20,000 2,375 $50,000 - - - -
-
kWh
-
-
kW-months/year
$20,000
2,375
MMBtu
$50,000
-
$
-
-
%
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,200
Cost:
$30,000
- - - - $18,200 910 - - - - -
-
kWh
-
-
kW-months/year
$18,200
910
MMBtu
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,600
Cost:
$2,600
$2,400 39,100 $200 55 - - - - - - $2,400
39,100
kWh
$200
55
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,800
Cost:
$800
$8,500 135,600 $300 96 - - - - - - $8,500
135,600
kWh
$300
96
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,400
Cost:
$3,800
$1,000 16,700 $400 120 - - - - - - $1,000
16,700
kWh
$400
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$634,000
Cost:
$1,221,200
$11,900 191,400 $900 271 $38,200 3,285 $50,000 - $533,000 - $11,900
191,400
kWh
$900
271
kW-months/year
$38,200
3,285
MMBtu
$50,000
-
$
$533,000
-
%
TOTAL IMPLEMENTED Savings:
$22,200
Cost:
$36,400
$3,400 55,800 $600 175 $18,200 910 - - - - $3,400
55,800
kWh
$600
175
kW-months/year
$18,200
910
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Product Increase in Production