Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2008 |
Principal Product | Millwork and Molding |
NAICS | 321918 - Other Millwork (including Flooring) |
SIC | 2431 - Millwork |
Sales | $50,000,000-$100,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 1,760,000 |
Annual Production | 31,000 Thousand Feet |
Production Hrs. Annual | 3,680 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $640,241 | 17,870,400 | kWh | $0.04 |
Natural Gas | $268,448 | 24,688 | MMBtu | $10.87 |
TOTAL ENERGY COSTS | $908,689 | |||
RECOMMENDED SAVINGS* | $959,881 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1181 ELIMINATE A BY-PRODUCT |
Savings: $527,900 Cost: $300,000 |
- | - | - | - | - | - | $527,900 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$527,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $46,200 Cost: $34,030 |
$39,300 | 1,095,920 | $6,900 | 196 | - | - | - | - |
$39,300 1,095,920 kWh |
$6,900 196 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $20,500 Cost: $24,910 |
$20,500 | 569,600 | - | - | - | - | - | - |
$20,500 569,600 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE |
Savings: $64,651 Cost: - |
- | - | - | - | $64,651 | 5,981 | - | - |
- - kWh |
- - kW-months/year |
$64,651 5,981 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,800 Cost: $16,950 |
- | - | - | - | $10,800 | 1,000 | - | - |
- - kWh |
- - kW-months/year |
$10,800 1,000 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,850 Cost: $380 |
- | - | - | - | $1,850 | 58 | - | - |
- - kWh |
- - kW-months/year |
$1,850 58 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $287,980 Cost: $314,400 |
$16,980 | 693,700 | - | - | $271,000 | 31,536 | - | - |
$16,980 693,700 kWh |
- - kW-months/year |
$271,000 31,536 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $959,881 Cost: $690,670 |
$76,780 | 2,359,220 | $6,900 | 196 | $348,301 | 38,575 | $527,900 | - | $76,780 2,359,220 kWh |
$6,900 196 kW-months/year |
$348,301 38,575 MMBtu |
$527,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | By-product Production |