IAC Assessment: OR0528
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0528
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2008
Principal Product Millwork and Molding
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 1,760,000
Annual Production 31,000 Thousand Feet
Production Hrs. Annual 3,680
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $640,241 17,870,400 kWh $0.04
Natural Gas $268,448 24,688 MMBtu $10.87
TOTAL ENERGY COSTS $908,689
RECOMMENDED SAVINGS* $959,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 3.1181 ELIMINATE A BY-PRODUCT Savings:
$527,900
Cost:
$300,000
- - - - - - $527,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$527,900
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$46,200
Cost:
$34,030
$39,300 1,095,920 $6,900 196 - - - - $39,300
1,095,920
kWh
$6,900
196
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$20,500
Cost:
$24,910
$20,500 569,600 - - - - - - $20,500
569,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$64,651
Cost:
-
- - - - $64,651 5,981 - - -
-
kWh
-
-
kW-months/year
$64,651
5,981
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,800
Cost:
$16,950
- - - - $10,800 1,000 - - -
-
kWh
-
-
kW-months/year
$10,800
1,000
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,850
Cost:
$380
- - - - $1,850 58 - - -
-
kWh
-
-
kW-months/year
$1,850
58
MMBtu
-
-
$
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$287,980
Cost:
$314,400
$16,980 693,700 - - $271,000 31,536 - - $16,980
693,700
kWh
-
-
kW-months/year
$271,000
31,536
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$959,881
Cost:
$690,670
$76,780 2,359,220 $6,900 196 $348,301 38,575 $527,900 - $76,780
2,359,220
kWh
$6,900
196
kW-months/year
$348,301
38,575
MMBtu
$527,900
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production