IAC Assessment: OR0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2008
Principal Product Particle Board
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $100,000,000-$500,000,000
# of Employees 320
Plant Area (Sq.Ft.) 325,930
Annual Production 177,650,000 Pieces
Production Hrs. Annual 2,920
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,587,800 57,378,000 kWh $0.05
Natural Gas $3,362,351 3,261,252 MMBtu $1.03
TOTAL ENERGY COSTS $5,950,151
RECOMMENDED SAVINGS* $238,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$84,400
Cost:
$21,000
$84,400 2,286,864 - - - - $84,400
2,286,864
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.123 Maintenance Savings:
$70,600
Cost:
$500
- - - - $70,600 68,470 -
-
kWh
-
-
kW-months/year
$70,600
68,470
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,500
Cost:
$24,110
$31,500 761,000 - - - - $31,500
761,000
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$13,800
Cost:
$11,475
- - - - $13,800 730 -
-
kWh
-
-
kW-months/year
$13,800
730
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,580
Cost:
$4,200
$5,580 151,400 - - - - $5,580
151,400
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.612 General Savings:
$4,900
Cost:
$500
$4,900 132,678 - - - - $4,900
132,678
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,360
Cost:
$114,000
- - $27,360 3,800 - - -
-
kWh
$27,360
3,800
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$238,140
Cost:
$175,785
$126,380 3,331,942 $27,360 3,800 $84,400 69,200 $126,380
3,331,942
kWh
$27,360
3,800
kW-months/year
$84,400
69,200
MMBtu
TOTAL IMPLEMENTED Savings:
$75,500
Cost:
$1,000
$4,900 132,678 - - $70,600 68,470 $4,900
132,678
kWh
-
-
kW-months/year
$70,600
68,470
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas