IAC Assessment: OR0535
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0535
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2008
Principal Product Large Diameter Pipe
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 300,000
Annual Production 1 Units
Production Hrs. Annual 4,992
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $368,353 6,561,760 kWh $0.06
Electricity Demand $48,996 20,883 kW-months/year $2.35
Electricity Fees $46,308 - $ -
Natural Gas $189,757 17,360 MMBtu $10.93
TOTAL ENERGY COSTS $653,414
RECOMMENDED SAVINGS* $106,779 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$46,153
Cost:
$56,500
$46,153 176,773 - - $46,153
176,773
kWh
-
-
MMBtu
02: 2.2151 CLEAN STEAM COILS IN PROCESSING TANKS Savings:
$6,588
Cost:
$1,250
- - $6,588 794 -
-
kWh
$6,588
794
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$43,923
Cost:
$7,200
$43,923 863,036 - - $43,923
863,036
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,829
Cost:
$47,094
$7,829 102,474 - - $7,829
102,474
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,286
Cost:
$1,850
$2,286 18,527 - - $2,286
18,527
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$106,779
Cost:
$113,894
$100,191 1,160,810 $6,588 794 $100,191
1,160,810
kWh
$6,588
794
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas