IAC Assessment: OR0540
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0540
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2008
Principal Product Process Chemicals
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 49,000
Annual Production 40,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,900 1,620,000 kWh $0.06
Electricity Demand $22 4 kW-months/year $5.50
Electricity Fees $627 - $ -
Natural Gas $46 353 MMBtu $0.13
TOTAL ENERGY COSTS $96,671
RECOMMENDED SAVINGS* $44,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$29
Cost:
$10,000
- - - - - - $8 92,032 - - $21 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8
92,032
Tgal
-
-
$
$21
-
Tgal
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$14,149
Cost:
$6,100
- - - - $14,149 1,489 - - - - - - -
-
kWh
-
-
kW-months/year
$14,149
1,489
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,932
Cost:
$13,049
$1,561 24,960 $178 5 - - - - $1,193 - - - $1,561
24,960
kWh
$178
5
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,193
-
$
-
-
Tgal
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$23,433
Cost:
$257,380
$23,433 351,000 - - - - - - - - - - $23,433
351,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$434
Cost:
$12,400
$434 5,793 - - - - - - - - - - $434
5,793
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,216
Cost:
-
$2,216 35,432 - - - - - - - - - - $2,216
35,432
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$699
Cost:
$1,398
$699 10,290 - - - - - - - - - - $699
10,290
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$341
Cost:
-
$341 4,992 - - - - - - - - - - $341
4,992
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$44,233
Cost:
$300,327
$28,684 432,467 $178 5 $14,149 1,489 $8 92,032 $1,193 - $21 - $28,684
432,467
kWh
$178
5
kW-months/year
$14,149
1,489
MMBtu
$8
92,032
Tgal
$1,193
-
$
$21
-
Tgal
TOTAL IMPLEMENTED Savings:
$17,110
Cost:
$29,149
$1,561 24,960 $178 5 $14,149 1,489 $8 92,032 $1,193 - $21 - $1,561
24,960
kWh
$178
5
kW-months/year
$14,149
1,489
MMBtu
$8
92,032
Tgal
$1,193
-
$
$21
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption