IAC Assessment: OR0541
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0541
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2008
Principal Product Peptides, Amino Acids
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 9,400
Annual Production 55,000 Pounds
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,702 5,319,600 kWh $0.05
Natural Gas $187,178 19,088 MMBtu $9.81
TOTAL ENERGY COSTS $458,880
RECOMMENDED SAVINGS* $348,182 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $277,000
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$277,000
Cost:
$77,500
- - - - $277,000 18,995 -
-
kWh
-
-
$
$277,000
18,995
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,123
Cost:
$8,200
$13,123 305,199 - - - - $13,123
305,199
kWh
-
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,377
Cost:
$3,000
$10,377 130,849 - - - - $10,377
130,849
kWh
-
-
$
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,200
Cost:
$8,200
$8,200 130 - - - - $8,200
130
kWh
-
-
$
-
-
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$18,926
Cost:
$289,553
$18,926 393 - - - - $18,926
393
kWh
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,170
Cost:
$5,250
- - $1,170 - - - -
-
kWh
$1,170
-
$
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$19,386
Cost:
$49,854
- - - - $19,386 1,978 -
-
kWh
-
-
$
$19,386
1,978
MMBtu
TOTAL RECOMMENDED Savings:
$348,182
Cost:
$441,557
$50,626 436,571 $1,170 - $296,386 20,973 $50,626
436,571
kWh
$1,170
-
$
$296,386
20,973
MMBtu
TOTAL IMPLEMENTED Savings:
$277,000
Cost:
$77,500
- - - - $277,000 18,995 -
-
kWh
-
-
$
$277,000
18,995
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas