IAC logo
IAC Assessment: OR0545
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0545
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2009
Principal Product Plywood
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 355
Plant Area (Sq.Ft.) 540,000
Annual Production 300,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $934,352 25,480,000 kWh $0.04
Electricity Demand $105,084 48,204 kW-months/year $2.18
Electricity Fees $166,064 - $ -
Natural Gas $48,776 6,975 MMBtu $6.99
Other Energy $3,199,626 533,271 MMBtu $6.00
TOTAL ENERGY COSTS $4,453,902
RECOMMENDED SAVINGS* $230,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,700
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Personnel Changes Electricity Usage Natural Gas Other Energy Personnel Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$40,900
Cost:
$40,900
$40,900 1,115,000 - - - - - - $40,900
1,115,000
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,700
Cost:
$4,100
- - - - $2,700 444 - - -
-
kWh
-
-
MMBtu
$2,700
444
MMBtu
-
-
$
03: 2.8221 CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS Savings:
$149,500
Cost:
$380,000
- - - - - - $149,500 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$149,500
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,100
Cost:
$24,800
- - $9,100 1,321 - - - - -
-
kWh
$9,100
1,321
MMBtu
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,200
Cost:
$58,700
$19,200 524,100 - - - - - - $19,200
524,100
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,600
Cost:
$35,300
$8,600 159,300 - - - - - - $8,600
159,300
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$230,000
Cost:
$543,800
$68,700 1,798,400 $9,100 1,321 $2,700 444 $149,500 - $68,700
1,798,400
kWh
$9,100
1,321
MMBtu
$2,700
444
MMBtu
$149,500
-
$
TOTAL IMPLEMENTED Savings:
$68,700
Cost:
$134,900
$68,700 1,798,400 - - - - - - $68,700
1,798,400
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Personnel Changes Electricity Usage Natural Gas Other Energy Personnel Changes