IAC Assessment: OR0548
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0548
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2009
Principal Product Plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 1,000,000
Annual Production 150,000 Thousand Feet
Production Hrs. Annual 7,448
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,836,527 48,920,000 kWh $0.04
Electricity Demand $389,319 104,272 kW-months/year $3.73
Natural Gas $28,421 1,025 MMBtu $27.73
Wood $1,500,000 900,000 MMBtu $1.67
TOTAL ENERGY COSTS $3,754,267
RECOMMENDED SAVINGS* $407,023 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,631
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Administrative Changes Electricity Usage Electricity Demand Wood Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6126 KEEP SOLID FUELS / RAW MATERIALS DRY Savings:
$294,300
Cost:
$290,000
- - - - $294,300 176,700 - - -
-
kWh
-
-
kW-months/year
$294,300
176,700
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$47,605
Cost:
$128,300
$38,182 979,274 $9,423 200 - - - - $38,182
979,274
kWh
$9,423
200
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$21,000
Cost:
$8,800
$21,000 540,220 - - - - - - $21,000
540,220
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$15,295
Cost:
-
$12,502 320,653 $2,793 60 - - - - $12,502
320,653
kWh
$2,793
60
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,882
Cost:
$9,900
$8,684 222,724 $1,198 25 - - - - $8,684
222,724
kWh
$1,198
25
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$8,092
Cost:
$1,600
$5,592 143,430 - - - - $2,500 - $5,592
143,430
kWh
-
-
kW-months/year
-
-
MMBtu
$2,500
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,349
Cost:
-
$7,349 188,479 - - - - - - $7,349
188,479
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,500
Cost:
$600
- - - - $3,500 1,136 - - -
-
kWh
-
-
kW-months/year
$3,500
1,136
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$407,023
Cost:
$439,200
$93,309 2,394,780 $13,414 285 $297,800 177,836 $2,500 - $93,309
2,394,780
kWh
$13,414
285
kW-months/year
$297,800
177,836
MMBtu
$2,500
-
$
TOTAL IMPLEMENTED Savings:
$83,631
Cost:
$138,800
$66,717 1,711,130 $13,414 285 $3,500 1,136 - - $66,717
1,711,130
kWh
$13,414
285
kW-months/year
$3,500
1,136
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Administrative Changes Electricity Usage Electricity Demand Wood Administrative Changes