IAC logo
IAC Assessment: OR0556
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0556
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2010
Principal Product Soy Sauce
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 100,000
Annual Production 3,200 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,749 2,241,600 kWh $0.07
Electricity Demand $31,180 6,519 kW-months/year $4.78
Natural Gas $196,679 228,083 MMBtu $0.86
TOTAL ENERGY COSTS $395,693
RECOMMENDED SAVINGS* $47,521 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,893
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$542
Cost:
-
$542 5,605 - - - - $542
5,605
kWh
-
-
$
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,765
Cost:
-
- - - - $1,765 - -
-
kWh
-
-
$
$1,765
-
$
03: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$8,900
Cost:
$8,900
- - $8,900 - - - -
-
kWh
$8,900
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,987
Cost:
$5,125
$8,987 116,324 - - - - $8,987
116,324
kWh
-
-
$
-
-
$
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$3,131
Cost:
$2,861
$3,131 45,748 - - - - $3,131
45,748
kWh
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,320
Cost:
$2,320
$2,320 29,982 - - - - $2,320
29,982
kWh
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,397
Cost:
$11,734
$5,397 69,855 - - - - $5,397
69,855
kWh
-
-
$
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$16,479
Cost:
$65,003
$16,479 218,700 - - - - $16,479
218,700
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,521
Cost:
$95,943
$36,856 486,214 $8,900 - $1,765 - $36,856
486,214
kWh
$8,900
-
$
$1,765
-
$
TOTAL IMPLEMENTED Savings:
$14,893
Cost:
$14,081
$5,993 81,335 $8,900 - - - $5,993
81,335
kWh
$8,900
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes