Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2010 |
Principal Product | Wood Boards, Chip |
NAICS | 321113 - Sawmills |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $10,000,000-$50,000,000 |
# of Employees | 133 |
Plant Area (Sq.Ft.) | 565,000 |
Annual Production | 1,150,000 Units |
Production Hrs. Annual | 8,400 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $675,263 | 16,628,000 | kWh | $0.04 |
Electricity Demand | $200,860 | 60,912 | kW-months/year | $3.30 |
Electricity Fees | $142,019 | - | $ | - |
Wood | $597,904 | 434,237 | MMBtu | $1.38 |
TOTAL ENERGY COSTS | $1,616,046 | |||
RECOMMENDED SAVINGS* | $1,401,516 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $265,603 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $35,913 Cost: $17,860 |
$35,913 | 862,672 | - | - | - | - |
$35,913 862,672 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $219,003 Cost: $250,000 |
$850,000 | 13,808,232 | $(-390,000) | (-284,672) | $(-240,997) | - |
$850,000 13,808,232 kWh |
$(-390,000) (-284,672) MMBtu |
$(-240,997) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $46,600 Cost: $244,000 |
$46,600 | 1,120,000 | - | - | - | - |
$46,600 1,120,000 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,100,000 Cost: $2,150,000 |
- | - | - | - | $1,100,000 | - |
- - kWh |
- - MMBtu |
$1,100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,401,516 Cost: $2,661,860 |
$932,513 | 15,790,904 | $(-390,000) | (-284,672) | $859,003 | - | $932,513 15,790,904 kWh |
$(-390,000) (-284,672) MMBtu |
$859,003 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $265,603 Cost: $494,000 |
$896,600 | 14,928,232 | $(-390,000) | (-284,672) | $(-240,997) | - | $896,600 14,928,232 kWh |
$(-390,000) (-284,672) MMBtu |
$(-240,997) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Administrative Changes | Electricity Usage | Wood | Administrative Changes |