IAC logo
IAC Assessment: OR0563
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0563
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2010
Principal Product Wood Boards, Chip
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 133
Plant Area (Sq.Ft.) 565,000
Annual Production 1,150,000 Units
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $675,263 16,628,000 kWh $0.04
Electricity Demand $200,860 60,912 kW-months/year $3.30
Electricity Fees $142,019 - $ -
Wood $597,904 434,237 MMBtu $1.38
TOTAL ENERGY COSTS $1,616,046
RECOMMENDED SAVINGS* $1,401,516 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $265,603
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$35,913
Cost:
$17,860
$35,913 862,672 - - - - $35,913
862,672
kWh
-
-
MMBtu
-
-
$
02: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$219,003
Cost:
$250,000
$850,000 13,808,232 $(-390,000) (-284,672) $(-240,997) - $850,000
13,808,232
kWh
$(-390,000)
(-284,672)
MMBtu
$(-240,997)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$46,600
Cost:
$244,000
$46,600 1,120,000 - - - - $46,600
1,120,000
kWh
-
-
MMBtu
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,100,000
Cost:
$2,150,000
- - - - $1,100,000 - -
-
kWh
-
-
MMBtu
$1,100,000
-
$
TOTAL RECOMMENDED Savings:
$1,401,516
Cost:
$2,661,860
$932,513 15,790,904 $(-390,000) (-284,672) $859,003 - $932,513
15,790,904
kWh
$(-390,000)
(-284,672)
MMBtu
$859,003
-
$
TOTAL IMPLEMENTED Savings:
$265,603
Cost:
$494,000
$896,600 14,928,232 $(-390,000) (-284,672) $(-240,997) - $896,600
14,928,232
kWh
$(-390,000)
(-284,672)
MMBtu
$(-240,997)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes