Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2012 |
Principal Product | Electricity |
NAICS | 221112 - Fossil Fuel Electric Power Generation |
SIC | 4911 - Electric Services |
Sales | $50,000,000-$100,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 1,500,000,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,157,403 | 15,565,458 | kWh | $0.07 |
Electricity Demand | $7,020 | 21,737 | kW-months/year | $0.32 |
Natural Gas | $10,128 | 1,478 | MMBtu | $6.85 |
TOTAL ENERGY COSTS | $1,174,551 | |||
RECOMMENDED SAVINGS* | $199,958 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $55,752 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $15,066 Cost: - |
$15,066 | 200,878 | - | - | - | - | - | - |
$15,066 200,878 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $125,819 Cost: $198,800 |
$125,819 | 1,677,590 | - | - | - | - | - | - |
$125,819 1,677,590 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $23,346 Cost: $55,000 |
$23,346 | 311,284 | - | - | - | - | - | - |
$23,346 311,284 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,300 Cost: $8,200 |
$2,300 | 31,000 | - | - | - | - | - | - |
$2,300 31,000 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $7,281 Cost: $12,000 |
$10,950 | 146,000 | $(-3,669) | (-536) | - | - | - | - |
$10,950 146,000 kWh |
$(-3,669) (-536) MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $8,805 Cost: $18,596 |
- | - | $8,805 | 1,320 | - | - | - | - |
- - kWh |
$8,805 1,320 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $17,340 Cost: $46,680 |
$16,121 | 214,941 | - | - | $4 | - | $1,215 | - |
$16,121 214,941 kWh |
- - MMBtu |
$4 - $ |
$1,215 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $199,958 Cost: $339,276 |
$193,602 | 2,581,692 | $5,136 | 784 | $4 | - | $1,215 | - | $193,602 2,581,692 kWh |
$5,136 784 MMBtu |
$4 - $ |
$1,215 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $55,752 Cost: $101,680 |
$54,533 | 727,103 | - | - | $4 | - | $1,215 | - | $54,533 727,103 kWh |
- - MMBtu |
$4 - $ |
$1,215 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Administrative Changes | Ancillary Material Cost |