IAC logo
IAC Assessment: OR0579
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0579
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Electricity
NAICS 221112 - Fossil Fuel Electric Power Generation
SIC 4911 - Electric Services
Sales $50,000,000-$100,000,000
# of Employees 20
Plant Area (Sq.Ft.) 30,000
Annual Production 1,500,000,000 Units
Production Hrs. Annual 6,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,157,403 15,565,458 kWh $0.07
Electricity Demand $7,020 21,737 kW-months/year $0.32
Natural Gas $10,128 1,478 MMBtu $6.85
TOTAL ENERGY COSTS $1,174,551
RECOMMENDED SAVINGS* $199,958 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,752
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$15,066
Cost:
-
$15,066 200,878 - - - - - - $15,066
200,878
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$125,819
Cost:
$198,800
$125,819 1,677,590 - - - - - - $125,819
1,677,590
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$23,346
Cost:
$55,000
$23,346 311,284 - - - - - - $23,346
311,284
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,300
Cost:
$8,200
$2,300 31,000 - - - - - - $2,300
31,000
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,281
Cost:
$12,000
$10,950 146,000 $(-3,669) (-536) - - - - $10,950
146,000
kWh
$(-3,669)
(-536)
MMBtu
-
-
$
-
-
$
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$8,805
Cost:
$18,596
- - $8,805 1,320 - - - - -
-
kWh
$8,805
1,320
MMBtu
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$17,340
Cost:
$46,680
$16,121 214,941 - - $4 - $1,215 - $16,121
214,941
kWh
-
-
MMBtu
$4
-
$
$1,215
-
$
TOTAL RECOMMENDED Savings:
$199,958
Cost:
$339,276
$193,602 2,581,692 $5,136 784 $4 - $1,215 - $193,602
2,581,692
kWh
$5,136
784
MMBtu
$4
-
$
$1,215
-
$
TOTAL IMPLEMENTED Savings:
$55,752
Cost:
$101,680
$54,533 727,103 - - $4 - $1,215 - $54,533
727,103
kWh
-
-
MMBtu
$4
-
$
$1,215
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost