Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 86,000
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 5,616
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $568,256 10,868,889 kWh $0.05
Electricity Demand $197,100 32,743 kW-months/year $6.02
Natural Gas $315,070 70,332 MMBtu $4.48
TOTAL ENERGY COSTS $1,080,426
RECOMMENDED SAVINGS* $127,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,161
Cost:
$1,000
$7,005 133,108 $3,155 505 - - $7,005
133,108
kWh
$3,155
505
kW-months/year
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$30,460
Cost:
$37,511
$22,987 436,764 $7,473 1,196 - - $22,987
436,764
kWh
$7,473
1,196
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,590
Cost:
$16,590
$12,905 245,209 $2,684 430 - - $12,905
245,209
kWh
$2,684
430
kW-months/year
-
-
MMBtu
04: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$36,155
Cost:
$7,334
- - - - $36,155 4,714 -
-
kWh
-
-
kW-months/year
$36,155
4,714
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,488
Cost:
$6,761
- - - - $7,488 976 -
-
kWh
-
-
kW-months/year
$7,488
976
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$27,601
Cost:
$81,000
$20,559 390,624 $7,043 1,127 - - $20,559
390,624
kWh
$7,043
1,127
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$127,454
Cost:
$150,196
$63,456 1,205,705 $20,355 3,257 $43,643 5,690 $63,456
1,205,705
kWh
$20,355
3,257
kW-months/year
$43,643
5,690
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas