IAC logo
IAC Assessment: OR0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Dairy Processing
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 30,169
Annual Production 9,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,900 1,844,400 kWh $0.05
Electricity Demand $26,289 3,980 kW-months/year $6.61
Natural Gas $8,043 1,210 MMBtu $6.65
TOTAL ENERGY COSTS $135,232
RECOMMENDED SAVINGS* $23,045 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,051
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2626 AVOID FROST FORMATION ON EVAPORATORS Savings:
$3,140
Cost:
$2,412
$2,190 37,927 $950 136 - - - - - - $2,190
37,927
kWh
$950
136
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$2,994
Cost:
$10,000
$2,994 51,846 - - - - - - - - $2,994
51,846
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,663
Cost:
$19,592
$4,180 72,375 $306 48 - - $561 - $1,616 - $4,180
72,375
kWh
$306
48
kW-months/year
-
-
MMBtu
$561
-
$
$1,616
-
$
04: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$6,078
Cost:
$500
- - - - $6,578 1,205 $(-500) - - - -
-
kWh
-
-
kW-months/year
$6,578
1,205
MMBtu
$(-500)
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,391
Cost:
$3,854
$1,391 57,604 - - - - - - - - $1,391
57,604
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$2,779
Cost:
$6,600
$2,779 48,116 - - - - - - - - $2,779
48,116
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,045
Cost:
$42,958
$13,534 267,868 $1,256 184 $6,578 1,205 $61 - $1,616 - $13,534
267,868
kWh
$1,256
184
kW-months/year
$6,578
1,205
MMBtu
$61
-
$
$1,616
-
$
TOTAL IMPLEMENTED Savings:
$20,051
Cost:
$32,958
$10,540 216,022 $1,256 184 $6,578 1,205 $61 - $1,616 - $10,540
216,022
kWh
$1,256
184
kW-months/year
$6,578
1,205
MMBtu
$61
-
$
$1,616
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost