IAC logo
IAC Assessment: OR0586
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0586
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Cleaned Buses
NAICS 485113 - Bus and Other Motor Vehicle Transit Systems
SIC 4111 - Local And Suburban Transit
Sales <$500,000
# of Employees 78
Plant Area (Sq.Ft.) 63,644
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,419 1,764,570 kWh $0.06
Natural Gas $53,167 5,473 MMBtu $9.71
Fuel Oil #2 $7,013,040 304,079 MMBtu $23.06
TOTAL ENERGY COSTS $7,225,822
RECOMMENDED SAVINGS* $528,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,449
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$7,216
Cost:
$7,500
$7,216 122,729 - - - - - - - - - - $7,216
122,729
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$5,374
Cost:
$200
- - - - $5,374 553 - - - - - - -
-
kWh
-
-
kW-months/year
$5,374
553
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,914
Cost:
$812
$2,914 49,565 - - - - - - - - - - $2,914
49,565
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$507,177
Cost:
$120,000
- - - - - - $507,177 20,282 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$507,177
20,282
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,267
Cost:
$4,001
$879 14,953 $46 36 - - - - $201 - $141 - $879
14,953
kWh
$46
36
kW-months/year
-
-
MMBtu
-
-
MMBtu
$201
-
$
$141
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$666
Cost:
$500
- - - - $1,166 120 - - $(-500) - - - -
-
kWh
-
-
kW-months/year
$1,166
120
MMBtu
-
-
MMBtu
$(-500)
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$762
Cost:
-
- - - - - - - - - - $762 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$762
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,517
Cost:
$3,375
$3,275 55,694 $242 192 - - - - - - - - $3,275
55,694
kWh
$242
192
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$528,893
Cost:
$136,388
$14,284 242,941 $288 228 $6,540 673 $507,177 20,282 $(-299) - $903 - $14,284
242,941
kWh
$288
228
kW-months/year
$6,540
673
MMBtu
$507,177
20,282
MMBtu
$(-299)
-
$
$903
-
$
TOTAL IMPLEMENTED Savings:
$20,449
Cost:
$12,387
$13,405 227,988 $242 192 $6,540 673 - - $(-500) - $762 - $13,405
227,988
kWh
$242
192
kW-months/year
$6,540
673
MMBtu
-
-
MMBtu
$(-500)
-
$
$762
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost