Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2012 |
Principal Product | Cleaned Buses |
NAICS | 485113 - Bus and Other Motor Vehicle Transit Systems |
SIC | 4111 - Local And Suburban Transit |
Sales | <$500,000 |
# of Employees | 78 |
Plant Area (Sq.Ft.) | 63,644 |
Annual Production | 0 Units |
Production Hrs. Annual | 8,760 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $110,419 | 1,764,570 | kWh | $0.06 |
Natural Gas | $53,167 | 5,473 | MMBtu | $9.71 |
Fuel Oil #2 | $7,013,040 | 304,079 | MMBtu | $23.06 |
TOTAL ENERGY COSTS | $7,225,822 | |||
RECOMMENDED SAVINGS* | $528,893 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,449 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $7,216 Cost: $7,500 |
$7,216 | 122,729 | - | - | - | - | - | - | - | - | - | - |
$7,216 122,729 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $5,374 Cost: $200 |
- | - | - | - | $5,374 | 553 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,374 553 MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,914 Cost: $812 |
$2,914 | 49,565 | - | - | - | - | - | - | - | - | - | - |
$2,914 49,565 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $507,177 Cost: $120,000 |
- | - | - | - | - | - | $507,177 | 20,282 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$507,177 20,282 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,267 Cost: $4,001 |
$879 | 14,953 | $46 | 36 | - | - | - | - | $201 | - | $141 | - |
$879 14,953 kWh |
$46 36 kW-months/year |
- - MMBtu |
- - MMBtu |
$201 - $ |
$141 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $666 Cost: $500 |
- | - | - | - | $1,166 | 120 | - | - | $(-500) | - | - | - |
- - kWh |
- - kW-months/year |
$1,166 120 MMBtu |
- - MMBtu |
$(-500) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $762 Cost: - |
- | - | - | - | - | - | - | - | - | - | $762 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
$762 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,517 Cost: $3,375 |
$3,275 | 55,694 | $242 | 192 | - | - | - | - | - | - | - | - |
$3,275 55,694 kWh |
$242 192 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $528,893 Cost: $136,388 |
$14,284 | 242,941 | $288 | 228 | $6,540 | 673 | $507,177 | 20,282 | $(-299) | - | $903 | - | $14,284 242,941 kWh |
$288 228 kW-months/year |
$6,540 673 MMBtu |
$507,177 20,282 MMBtu |
$(-299) - $ |
$903 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,449 Cost: $12,387 |
$13,405 | 227,988 | $242 | 192 | $6,540 | 673 | - | - | $(-500) | - | $762 | - | $13,405 227,988 kWh |
$242 192 kW-months/year |
$6,540 673 MMBtu |
- - MMBtu |
$(-500) - $ |
$762 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | Ancillary Material Cost |