IAC logo
IAC Assessment: OR0591
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0591
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Beer/Ales
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 113,561
Annual Production 7,487 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,858 3,829,525 kWh $0.06
Electricity Demand $52,854 8,414 kW-months/year $6.28
Natural Gas $193,480 36,297 MMBtu $5.33
TOTAL ENERGY COSTS $482,629
RECOMMENDED SAVINGS* $1,016,744 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $922,923
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$920,649
Cost:
$25,909
$(-10,851) (-181,793) - - - - - - $931,500 - $(-10,851)
(-181,793)
kWh
-
-
kW-months/year
-
-
$
-
-
$
$931,500
-
%
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$93,821
Cost:
$27,749
- - - - - - - - $93,821 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$93,821
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,274
Cost:
$6,968
$662 11,097 $240 36 $990 - $382 - - - $662
11,097
kWh
$240
36
kW-months/year
$990
-
$
$382
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,016,744
Cost:
$60,626
$(-10,189) (-170,696) $240 36 $990 - $382 - $1,025,321 - $(-10,189)
(-170,696)
kWh
$240
36
kW-months/year
$990
-
$
$382
-
$
$1,025,321
-
%
TOTAL IMPLEMENTED Savings:
$922,923
Cost:
$32,877
$(-10,189) (-170,696) $240 36 $990 - $382 - $931,500 - $(-10,189)
(-170,696)
kWh
$240
36
kW-months/year
$990
-
$
$382
-
$
$931,500
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production