IAC Assessment: OR0596
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0596
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Snacks
NAICS 311919 - Other Snack Food Manufacturing
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 6,570,000 Pounds
Production Hrs. Annual 5,616
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,567 1,396,175 kWh $0.07
Electricity Demand $26,715 3,365 kW-months/year $7.94
Electricity Fees $2,078 - $ -
Natural Gas $388,716 809,085 MMBtu $0.48
TOTAL ENERGY COSTS $587,459
RECOMMENDED SAVINGS* $165,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,070
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,782
Cost:
$7,200
- - - - - - - - - - $4,782 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$4,782
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,010
Cost:
$7,460
$3,232 46,038 - - - - - - - - - - $427 - $351 - - - $3,232
46,038
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$427
-
$
$351
-
$
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,779
Cost:
$2,217
$2,820 42,909 $959 128 - - - - - - - - - - - - - - $2,820
42,909
kWh
$959
128
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$9,274
Cost:
$46,450
$(-2,271) (-34,560) $(-451) (-60) - - $4,800 351 - - - - $7,196 - - - - - $(-2,271)
(-34,560)
kWh
$(-451)
(-60)
kW-months/year
-
-
MMBtu
$4,800
351
MMBtu
-
-
Tgal
-
-
lb
$7,196
-
$
-
-
$
-
-
Tgal
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$15,326
Cost:
$6,711
$11,131 169,399 $4,195 559 - - - - - - - - - - - - - - $11,131
169,399
kWh
$4,195
559
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$80,359
Cost:
$51,328
- - - - $80,359 23,158 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$80,359
23,158
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$48,291
Cost:
$10,000
$(-81) - - - - - - - $34,990 6,589 - - $(-720) - - - $14,102 - $(-81)
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$34,990
6,589
Tgal
-
-
lb
$(-720)
-
$
-
-
$
$14,102
-
Tgal
TOTAL RECOMMENDED Savings:
$165,821
Cost:
$131,366
$14,831 223,786 $4,703 627 $80,359 23,158 $4,800 351 $34,990 6,589 $4,782 - $6,903 - $351 - $14,102 - $14,831
223,786
kWh
$4,703
627
kW-months/year
$80,359
23,158
MMBtu
$4,800
351
MMBtu
$34,990
6,589
Tgal
$4,782
-
lb
$6,903
-
$
$351
-
$
$14,102
-
Tgal
TOTAL IMPLEMENTED Savings:
$52,070
Cost:
$12,217
$2,739 42,909 $959 128 - - - - $34,990 6,589 - - $(-720) - - - $14,102 - $2,739
42,909
kWh
$959
128
kW-months/year
-
-
MMBtu
-
-
MMBtu
$34,990
6,589
Tgal
-
-
lb
$(-720)
-
$
-
-
$
$14,102
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas LPG Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Water Consumption