IAC logo
IAC Assessment: OR0599
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0599
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Fish
NAICS 424420 - Packaged Frozen Food Merchant Wholesalers
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 60,000
Annual Production 32,000,000 Units
Production Hrs. Annual 6,300
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,258 2,323,716 kWh $0.06
Electricity Demand $21,646 5,582 kW-months/year $3.88
Electricity Fees $9,662 - $ -
TOTAL ENERGY COSTS $181,566
RECOMMENDED SAVINGS* $47,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,328
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,611
Cost:
$12,467
$7,856 117,858 $933 188 - - - - $91 - $(-1,269) - $7,856
117,858
kWh
$933
188
kW-months/year
-
-
MMBtu
-
-
$
$91
-
$
$(-1,269)
-
$
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$35,308
Cost:
-
$(-756) (-11,539) - - - - $36,064 - - - - - $(-756)
(-11,539)
kWh
-
-
kW-months/year
-
-
MMBtu
$36,064
-
$
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,422
Cost:
-
$(-1,089) (-16,489) $(-754) (-152) $3,265 124 - - - - - - $(-1,089)
(-16,489)
kWh
$(-754)
(-152)
kW-months/year
$3,265
124
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$1,409
Cost:
-
$1,409 21,346 - - - - - - - - - - $1,409
21,346
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$1,964
Cost:
$17,576
$1,904 28,827 $60 12 - - - - - - - - $1,904
28,827
kWh
$60
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,714
Cost:
$30,043
$9,324 140,003 $239 48 $3,265 124 $36,064 - $91 - $(-1,269) - $9,324
140,003
kWh
$239
48
kW-months/year
$3,265
124
MMBtu
$36,064
-
$
$91
-
$
$(-1,269)
-
$
TOTAL IMPLEMENTED Savings:
$44,328
Cost:
$12,467
$8,509 127,665 $933 188 - - $36,064 - $91 - $(-1,269) - $8,509
127,665
kWh
$933
188
kW-months/year
-
-
MMBtu
$36,064
-
$
$91
-
$
$(-1,269)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Administrative Changes Ancillary Material Cost