Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2012 |
Principal Product | Fish |
NAICS | 424420 - Packaged Frozen Food Merchant Wholesalers |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $10,000,000-$50,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 32,000,000 Units |
Production Hrs. Annual | 6,300 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $150,258 | 2,323,716 | kWh | $0.06 |
Electricity Demand | $21,646 | 5,582 | kW-months/year | $3.88 |
Electricity Fees | $9,662 | - | $ | - |
TOTAL ENERGY COSTS | $181,566 | |||
RECOMMENDED SAVINGS* | $47,714 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,328 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,611 Cost: $12,467 |
$7,856 | 117,858 | $933 | 188 | - | - | - | - | $91 | - | $(-1,269) | - |
$7,856 117,858 kWh |
$933 188 kW-months/year |
- - MMBtu |
- - $ |
$91 - $ |
$(-1,269) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $35,308 Cost: - |
$(-756) | (-11,539) | - | - | - | - | $36,064 | - | - | - | - | - |
$(-756) (-11,539) kWh |
- - kW-months/year |
- - MMBtu |
$36,064 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,422 Cost: - |
$(-1,089) | (-16,489) | $(-754) | (-152) | $3,265 | 124 | - | - | - | - | - | - |
$(-1,089) (-16,489) kWh |
$(-754) (-152) kW-months/year |
$3,265 124 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $1,409 Cost: - |
$1,409 | 21,346 | - | - | - | - | - | - | - | - | - | - |
$1,409 21,346 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $1,964 Cost: $17,576 |
$1,904 | 28,827 | $60 | 12 | - | - | - | - | - | - | - | - |
$1,904 28,827 kWh |
$60 12 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,714 Cost: $30,043 |
$9,324 | 140,003 | $239 | 48 | $3,265 | 124 | $36,064 | - | $91 | - | $(-1,269) | - | $9,324 140,003 kWh |
$239 48 kW-months/year |
$3,265 124 MMBtu |
$36,064 - $ |
$91 - $ |
$(-1,269) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,328 Cost: $12,467 |
$8,509 | 127,665 | $933 | 188 | - | - | $36,064 | - | $91 | - | $(-1,269) | - | $8,509 127,665 kWh |
$933 188 kW-months/year |
- - MMBtu |
$36,064 - $ |
$91 - $ |
$(-1,269) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost |