IAC Assessment: OR0600
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2012
Principal Product Drywall Corner Trims
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 55,000
Annual Production 4,320,000 Units
Production Hrs. Annual 1,800
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,717 1,707,000 kWh $0.06
Electricity Demand $44,130 6,617 kW-months/year $6.67
Electricity Fees $10,909 - $ -
Natural Gas $3,562 388 MMBtu $9.18
TOTAL ENERGY COSTS $156,318
RECOMMENDED SAVINGS* $35,144 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,865
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$14,559
Cost:
$2,500
$11,012 187,814 $3,547 519 - - - - - - $11,012
187,814
kWh
$3,547
519
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,704
Cost:
$500
$943 16,087 $761 111 - - - - - - $943
16,087
kWh
$761
111
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$334
Cost:
-
$334 5,688 - - - - - - - - $334
5,688
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$940
Cost:
$392
$565 9,640 $375 55 - - - - - - $565
9,640
kWh
$375
55
kW-months/year
-
-
$
-
-
$
-
-
$
05: 4.622 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES Savings:
$4,720
Cost:
-
$(-334) (-5,702) - - - - - - $5,054 - $(-334)
(-5,702)
kWh
-
-
kW-months/year
-
-
$
-
-
$
$5,054
-
$
06: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$6,653
Cost:
$385
- - - - - - - - $6,653 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$6,653
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,399
Cost:
$560
$5,299 90,381 - - $(-3,900) - - - - - $5,299
90,381
kWh
-
-
kW-months/year
$(-3,900)
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,835
Cost:
$2,724
$3,694 63,013 $531 78 $146 - $464 - - - $3,694
63,013
kWh
$531
78
kW-months/year
$146
-
$
$464
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$35,144
Cost:
$7,061
$21,513 366,921 $5,214 763 $(-3,754) - $464 - $11,707 - $21,513
366,921
kWh
$5,214
763
kW-months/year
$(-3,754)
-
$
$464
-
$
$11,707
-
$
TOTAL IMPLEMENTED Savings:
$15,865
Cost:
$4,561
$10,835 184,809 $1,667 244 $(-3,754) - $464 - $6,653 - $10,835
184,809
kWh
$1,667
244
kW-months/year
$(-3,754)
-
$
$464
-
$
$6,653
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product