Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2012 |
Principal Product | Drywall Corner Trims |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 4,320,000 Units |
Production Hrs. Annual | 1,800 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,717 | 1,707,000 | kWh | $0.06 |
Electricity Demand | $44,130 | 6,617 | kW-months/year | $6.67 |
Electricity Fees | $10,909 | - | $ | - |
Natural Gas | $3,562 | 388 | MMBtu | $9.18 |
TOTAL ENERGY COSTS | $156,318 | |||
RECOMMENDED SAVINGS* | $35,144 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,865 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $14,559 Cost: $2,500 |
$11,012 | 187,814 | $3,547 | 519 | - | - | - | - | - | - |
$11,012 187,814 kWh |
$3,547 519 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,704 Cost: $500 |
$943 | 16,087 | $761 | 111 | - | - | - | - | - | - |
$943 16,087 kWh |
$761 111 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $334 Cost: - |
$334 | 5,688 | - | - | - | - | - | - | - | - |
$334 5,688 kWh |
- - kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $940 Cost: $392 |
$565 | 9,640 | $375 | 55 | - | - | - | - | - | - |
$565 9,640 kWh |
$375 55 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.622 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES |
Savings: $4,720 Cost: - |
$(-334) | (-5,702) | - | - | - | - | - | - | $5,054 | - |
$(-334) (-5,702) kWh |
- - kW-months/year |
- - $ |
- - $ |
$5,054 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF |
Savings: $6,653 Cost: $385 |
- | - | - | - | - | - | - | - | $6,653 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - $ |
$6,653 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,399 Cost: $560 |
$5,299 | 90,381 | - | - | $(-3,900) | - | - | - | - | - |
$5,299 90,381 kWh |
- - kW-months/year |
$(-3,900) - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,835 Cost: $2,724 |
$3,694 | 63,013 | $531 | 78 | $146 | - | $464 | - | - | - |
$3,694 63,013 kWh |
$531 78 kW-months/year |
$146 - $ |
$464 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,144 Cost: $7,061 |
$21,513 | 366,921 | $5,214 | 763 | $(-3,754) | - | $464 | - | $11,707 | - | $21,513 366,921 kWh |
$5,214 763 kW-months/year |
$(-3,754) - $ |
$464 - $ |
$11,707 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,865 Cost: $4,561 |
$10,835 | 184,809 | $1,667 | 244 | $(-3,754) | - | $464 | - | $6,653 | - | $10,835 184,809 kWh |
$1,667 244 kW-months/year |
$(-3,754) - $ |
$464 - $ |
$6,653 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Administrative Changes | Ancillary Material Cost | Primary Product |