Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2013 |
Principal Product | Carbon Materials |
NAICS | 335991 - Carbon and Graphite Product Manufacturing |
SIC | 3624 - Carbon And Graphite Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 76,000 |
Annual Production | 600,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $111,791 | 2,049,320 | kWh | $0.05 |
Electricity Demand | $72,356 | 9,196 | kW-months/year | $7.87 |
Electricity Fees | $12,011 | - | $ | - |
Natural Gas | $71,310 | 11,932 | MMBtu | $5.98 |
TOTAL ENERGY COSTS | $267,468 | |||
RECOMMENDED SAVINGS* | $231,831 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,862 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,634 Cost: $500 |
$7,804 | 144,189 | $830 | 103 | - | - |
$7,804 144,189 kWh |
$830 103 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $144,955 Cost: $110,000 |
- | - | - | - | $144,955 | 27,663 |
- - kWh |
- - kW-months/year |
$144,955 27,663 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $53,512 Cost: $43,218 |
- | - | - | - | $53,512 | 6,697 |
- - kWh |
- - kW-months/year |
$53,512 6,697 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $13,502 Cost: $5,712 |
$11,209 | 207,194 | $2,293 | 284 | - | - |
$11,209 207,194 kWh |
$2,293 284 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $11,228 Cost: $11,850 |
$9,715 | 179,509 | $1,513 | 188 | - | - |
$9,715 179,509 kWh |
$1,513 188 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $231,831 Cost: $171,280 |
$28,728 | 530,892 | $4,636 | 575 | $198,467 | 34,360 | $28,728 530,892 kWh |
$4,636 575 kW-months/year |
$198,467 34,360 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,862 Cost: $12,350 |
$17,519 | 323,698 | $2,343 | 291 | - | - | $17,519 323,698 kWh |
$2,343 291 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |