IAC logo
IAC Assessment: OR0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Reclaimed Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 150
Plant Area (Sq.Ft.) 2,000,000
Annual Production 41,975,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,714,428 65,253,760 kWh $0.06
Electricity Demand $485,134 131,102 kW-months/year $3.70
Natural Gas $104,241 10,686 MMBtu $9.75
TOTAL ENERGY COSTS $4,303,803
RECOMMENDED SAVINGS* $364,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$161,379
Cost:
$344
$161,379 2,662,577 - - - - $161,379
2,662,577
kWh
-
-
kW-months/year
-
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$39,128
Cost:
-
$36,108 595,743 $3,020 816 - - $36,108
595,743
kWh
$3,020
816
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$119,795
Cost:
-
$89,199 1,471,680 $7,963 2,016 $22,633 - $89,199
1,471,680
kWh
$7,963
2,016
kW-months/year
$22,633
-
$
04: 4.632 CHANGE OPERATING CONDITIONS Savings:
$14,380
Cost:
-
$13,201 217,810 $1,179 298 - - $13,201
217,810
kWh
$1,179
298
kW-months/year
-
-
$
05: 2.5123 REDUCE FLUID FLOW RATES Savings:
$9,051
Cost:
$9,200
$8,083 133,376 $968 245 - - $8,083
133,376
kWh
$968
245
kW-months/year
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20,282
Cost:
$25,500
$20,282 334,632 - - - - $20,282
334,632
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$364,015
Cost:
$35,044
$328,252 5,415,818 $13,130 3,375 $22,633 - $328,252
5,415,818
kWh
$13,130
3,375
kW-months/year
$22,633
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes