IAC Assessment: OR0619
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0619
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Tools
NAICS 335991 - Carbon and Graphite Product Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 116,114
Annual Production 197,223 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,391 2,831,200 kWh $0.07
Electricity Demand $34,382 7,019 kW-months/year $4.90
Electricity Fees $24,190 - $ -
Natural Gas $88,652 12,310 MMBtu $7.20
TOTAL ENERGY COSTS $356,615
RECOMMENDED SAVINGS* $40,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$7,073
Cost:
$2,342
$7,073 99,122 - - - - - - - - $7,073
99,122
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.5123 REDUCE FLUID FLOW RATES Savings:
$2,879
Cost:
$6,200
$2,879 40,345 - - - - - - - - $2,879
40,345
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,300
Cost:
$50,000
$17,182 240,776 $2,989 374 - - $1,914 - $1,215 - $17,182
240,776
kWh
$2,989
374
kW-months/year
-
-
MMBtu
$1,914
-
$
$1,215
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$679
Cost:
$1,677
- - - - $679 101 - - - - -
-
kWh
-
-
kW-months/year
$679
101
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,667
Cost:
$2,342
$525 7,355 $1,142 143 - - - - - - $525
7,355
kWh
$1,142
143
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,550
Cost:
$13,225
- - - - $4,550 585 - - - - -
-
kWh
-
-
kW-months/year
$4,550
585
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,148
Cost:
$75,786
$27,659 387,598 $4,131 517 $5,229 686 $1,914 - $1,215 - $27,659
387,598
kWh
$4,131
517
kW-months/year
$5,229
686
MMBtu
$1,914
-
$
$1,215
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost