IAC logo
IAC Assessment: OR0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Cases Distributed Annually
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 305,000
Annual Production 22,672,500 Pieces
Production Hrs. Annual 5,800
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $614,317 10,701,440 kWh $0.06
Electricity Demand $309,381 27,284 kW-months/year $11.34
Electricity Fees $65,746 - $ -
Natural Gas $457,972 64,237 MMBtu $7.13
TOTAL ENERGY COSTS $1,870,089
RECOMMENDED SAVINGS* $19,895 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,727
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$11,360
Cost:
$250
$11,360 190,348 - - - - - - $11,360
190,348
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,168
Cost:
$5,544
$4,818 80,736 $1,350 111 - - - - $4,818
80,736
kWh
$1,350
111
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,567
Cost:
$1,634
$1,292 21,641 $547 45 - - $(-272) - $1,292
21,641
kWh
$547
45
kW-months/year
-
-
MMBtu
$(-272)
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$800
Cost:
$417
- - - - $800 128 - - -
-
kWh
-
-
kW-months/year
$800
128
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,895
Cost:
$7,845
$17,470 292,725 $1,897 156 $800 128 $(-272) - $17,470
292,725
kWh
$1,897
156
kW-months/year
$800
128
MMBtu
$(-272)
-
$
TOTAL IMPLEMENTED Savings:
$13,727
Cost:
$2,301
$12,652 211,989 $547 45 $800 128 $(-272) - $12,652
211,989
kWh
$547
45
kW-months/year
$800
128
MMBtu
$(-272)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost