IAC Assessment: OR0632
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0632
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Fountain Syrup
NAICS 311930 - Flavoring Syrup and Concentrate Manufacturing
SIC 2087 - Flavoring Extracts And Syrups, Nec
Sales <$500,000
# of Employees 36
Plant Area (Sq.Ft.) 82,000
Annual Production 12,166,435 Units
Production Hrs. Annual 2,250
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,194 1,261,000 kWh $0.06
Electricity Demand $22,583 4,151 kW-months/year $5.44
Electricity Fees $13,172 - $ -
Natural Gas $58,759 9,350 MMBtu $6.28
TOTAL ENERGY COSTS $175,708
RECOMMENDED SAVINGS* $12,287 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,367
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$3,802
Cost:
-
$344 5,070 - - $3,458 640 - - - - $344
5,070
kWh
-
-
kW-months/year
$3,458
640
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,497
Cost:
$2,837
$2,126 31,313 - - - - $186 - $185 - $2,126
31,313
kWh
-
-
kW-months/year
-
-
MMBtu
$186
-
$
$185
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,285
Cost:
-
$1,128 16,609 - - $1,157 214 - - - - $1,128
16,609
kWh
-
-
kW-months/year
$1,157
214
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$870
Cost:
$500
$615 9,059 $255 49 - - - - - - $615
9,059
kWh
$255
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,833
Cost:
-
$3,459 50,941 $(-626) (-121) - - - - - - $3,459
50,941
kWh
$(-626)
(-121)
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,287
Cost:
$3,337
$7,672 112,992 $(-371) (-72) $4,615 854 $186 - $185 - $7,672
112,992
kWh
$(-371)
(-72)
kW-months/year
$4,615
854
MMBtu
$186
-
$
$185
-
$
TOTAL IMPLEMENTED Savings:
$3,367
Cost:
$3,337
$2,741 40,372 $255 49 - - $186 - $185 - $2,741
40,372
kWh
$255
49
kW-months/year
-
-
MMBtu
$186
-
$
$185
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost