IAC Assessment: OR0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Dimensional Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 450,000
Annual Production 120,000,000 Units
Production Hrs. Annual 3,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,375,810 26,073,312 kWh $0.05
Electricity Demand $506,626 69,593 kW-months/year $7.28
LPG $46,361 2,568 MMBtu $18.05
TOTAL ENERGY COSTS $1,928,797
RECOMMENDED SAVINGS* $240,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$102,712
Cost:
$87,114
$94,527 1,793,677 $8,185 1,137 - - - - $94,527
1,793,677
kWh
$8,185
1,137
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,951
Cost:
-
$3,913 74,248 $3,038 422 - - - - $3,913
74,248
kWh
$3,038
422
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$101,299
Cost:
$258,445
$70,693 1,341,432 $12,516 1,738 $2,870 - $15,220 - $70,693
1,341,432
kWh
$12,516
1,738
kW-months/year
$2,870
-
$
$15,220
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,747
Cost:
$1,502
$4,747 90,067 - - - - - - $4,747
90,067
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,923
Cost:
$1,344
$2,923 55,458 - - - - - - $2,923
55,458
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$22,225
Cost:
-
$23,225 440,710 - - $(-1,000) - - - $23,225
440,710
kWh
-
-
kW-months/year
$(-1,000)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$240,857
Cost:
$348,405
$200,028 3,795,592 $23,739 3,297 $1,870 - $15,220 - $200,028
3,795,592
kWh
$23,739
3,297
kW-months/year
$1,870
-
$
$15,220
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost