IAC logo
IAC Assessment: OR0636
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0636
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $100,000,000-$500,000,000
# of Employees 150
Plant Area (Sq.Ft.) 125,000
Annual Production 500,000 BBL
Production Hrs. Annual 7,488
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $327,714 5,554,200 kWh $0.06
Electricity Demand $103,276 13,380 kW-months/year $7.72
Electricity Fees $31,526 - $ -
Natural Gas $286,762 57,287 MMBtu $5.01
TOTAL ENERGY COSTS $2,209,871
RECOMMENDED SAVINGS* $831,669 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,708
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$31,057
Cost:
$7,123
$11,700 201,138 - - $19,357 3,112 - - - - - - $11,700
201,138
kWh
-
-
kW-months/year
$19,357
3,112
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$55,473
Cost:
$50,000
$(-2,499) (-42,953) $(-590) (-68) - - $42,446 3,369 - - $16,116 - $(-2,499)
(-42,953)
kWh
$(-590)
(-68)
kW-months/year
-
-
MMBtu
$42,446
3,369
Tgal
-
-
$
$16,116
-
Tgal
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$5,708
Cost:
$7,000
$5,708 66,374 - - - - - - - - - - $5,708
66,374
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$27,166
Cost:
$37,500
$(-780) (-13,407) $(-185) (-21) $28,131 4,523 - - - - - - $(-780)
(-13,407)
kWh
$(-185)
(-21)
kW-months/year
$28,131
4,523
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$712,265
Cost:
$3,300,000
$(-2,152) (-36,987) - - - - $764,417 34,063 $(-50,000) - - - $(-2,152)
(-36,987)
kWh
-
-
kW-months/year
-
-
MMBtu
$764,417
34,063
Tgal
$(-50,000)
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$831,669
Cost:
$3,401,623
$11,977 174,165 $(-775) (-89) $47,488 7,635 $806,863 37,432 $(-50,000) - $16,116 - $11,977
174,165
kWh
$(-775)
(-89)
kW-months/year
$47,488
7,635
MMBtu
$806,863
37,432
Tgal
$(-50,000)
-
$
$16,116
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,708
Cost:
$7,000
$5,708 66,374 - - - - - - - - - - $5,708
66,374
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Water Consumption