IAC logo
IAC Assessment: OR0638
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0638
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $100,000,000-$500,000,000
# of Employees 514
Plant Area (Sq.Ft.) 1,000,000
Annual Production 292,705 Thousand Feet
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,638,001 54,724,000 kWh $0.05
Electricity Demand $742,126 105,184 kW-months/year $7.06
Electricity Fees $123,966 - $ -
Natural Gas $105,639 16,905 MMBtu $6.25
Wood $3,040,000 1,223,560 MMBtu $2.48
TOTAL ENERGY COSTS $6,649,732
RECOMMENDED SAVINGS* $347,395 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,183
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood
$ kWh $ kW-months/year $ MMBtu
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$237,276
Cost:
$62,840
- - - - $237,276 95,438 -
-
kWh
-
-
kW-months/year
$237,276
95,438
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$28,255
Cost:
$27,375
$22,478 448,032 $5,777 818 - - $22,478
448,032
kWh
$5,777
818
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,466
Cost:
$8,550
$8,466 168,737 - - - - $8,466
168,737
kWh
-
-
kW-months/year
-
-
MMBtu
04: 3.4151 MINIMIZE WATER USAGE Savings:
$1,003
Cost:
-
$1,003 19,989 - - - - $1,003
19,989
kWh
-
-
kW-months/year
-
-
MMBtu
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$11,008
Cost:
$9,020
$11,008 219,406 - - - - $11,008
219,406
kWh
-
-
kW-months/year
-
-
MMBtu
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$40,207
Cost:
$13,800
$40,207 801,424 - - - - $40,207
801,424
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,180
Cost:
$10,000
- - $21,180 3,000 - - -
-
kWh
$21,180
3,000
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$347,395
Cost:
$131,585
$83,162 1,657,588 $26,957 3,818 $237,276 95,438 $83,162
1,657,588
kWh
$26,957
3,818
kW-months/year
$237,276
95,438
MMBtu
TOTAL IMPLEMENTED Savings:
$22,183
Cost:
$10,000
$1,003 19,989 $21,180 3,000 - - $1,003
19,989
kWh
$21,180
3,000
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood