IAC Assessment: OR0640
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0640
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Plywood
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $100,000,000-$500,000,000
# of Employees 390
Plant Area (Sq.Ft.) 6,423,000
Annual Production 316,955,697 Thousand Feet
Production Hrs. Annual 8,712
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,532,514 31,884,000 kWh $0.05
Electricity Demand $507,220 119,779 kW-months/year $4.23
Electricity Fees $84,389 - $ -
Natural Gas $45,799 5,923 MMBtu $7.73
LPG $30,194 1,824 MMBtu $16.55
TOTAL ENERGY COSTS $2,200,116
RECOMMENDED SAVINGS* $166,691 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $142,697
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$131,605
Cost:
$242,261
$104,903 2,081,399 $26,702 5,076 - - $104,903
2,081,399
kWh
$26,702
5,076
kW-months/year
-
-
MMBtu
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$2,455
Cost:
-
$2,455 46,591 - - - - $2,455
46,591
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,298
Cost:
$1,020
$1,298 25,955 - - - - $1,298
25,955
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$20,241
Cost:
$67,550
$(-8,835) (-154,290) $(-1,118) (-213) $30,194 1,824 $(-8,835)
(-154,290)
kWh
$(-1,118)
(-213)
kW-months/year
$30,194
1,824
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,092
Cost:
$12,092
$9,689 193,702 $1,403 267 - - $9,689
193,702
kWh
$1,403
267
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$166,691
Cost:
$322,923
$109,510 2,193,357 $26,987 5,130 $30,194 1,824 $109,510
2,193,357
kWh
$26,987
5,130
kW-months/year
$30,194
1,824
MMBtu
TOTAL IMPLEMENTED Savings:
$142,697
Cost:
$254,353
$114,592 2,275,101 $28,105 5,343 - - $114,592
2,275,101
kWh
$28,105
5,343
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG