IAC logo
IAC Assessment: OR0643
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0643
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Cast Steel
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 400,000
Annual Production 6,816 Tons
Production Hrs. Annual 4,160
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,071,800 22,519,200 kWh $0.05
Electricity Demand $915,952 106,410 kW-months/year $8.61
Electricity Fees $137,818 - $ -
Natural Gas $768,849 151,119 MMBtu $5.09
TOTAL ENERGY COSTS $2,894,419
RECOMMENDED SAVINGS* $246,897 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,697
Cost:
-
$3,799 75,636 $1,898 218 - - - - - - $3,799
75,636
kWh
$1,898
218
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,403
Cost:
$46,360
$13,923 277,191 $4,738 545 - - $1,690 - $4,052 - $13,923
277,191
kWh
$4,738
545
kW-months/year
-
-
MMBtu
$1,690
-
$
$4,052
-
$
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$216,797
Cost:
$596,000
$206,542 4,111,917 $118,703 13,644 $(-101,448) (-23,483) $(-7,000) - - - $206,542
4,111,917
kWh
$118,703
13,644
kW-months/year
$(-101,448)
(-23,483)
MMBtu
$(-7,000)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$246,897
Cost:
$642,360
$224,264 4,464,744 $125,339 14,407 $(-101,448) (-23,483) $(-5,310) - $4,052 - $224,264
4,464,744
kWh
$125,339
14,407
kW-months/year
$(-101,448)
(-23,483)
MMBtu
$(-5,310)
-
$
$4,052
-
$
TOTAL IMPLEMENTED Savings:
$30,100
Cost:
$46,360
$17,722 352,827 $6,636 763 - - $1,690 - $4,052 - $17,722
352,827
kWh
$6,636
763
kW-months/year
-
-
MMBtu
$1,690
-
$
$4,052
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost