IAC Assessment: OR0645
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0645
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Containerboard - Paper
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $100,000,000-$500,000,000
# of Employees 290
Plant Area (Sq.Ft.) 4,356,000
Annual Production 590,000 Units
Production Hrs. Annual 8,592
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,617,984 424,649,000 kWh $0.05
Natural Gas $9,438,835 1,958,098 MMBtu $4.82
TOTAL ENERGY COSTS $29,056,819
RECOMMENDED SAVINGS* $422,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $121,433
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$219,206
Cost:
$131,538
- - $219,206 53,335 - - - - -
-
kWh
$219,206
53,335
MMBtu
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$53,670
Cost:
$26,776
$69,450 1,845,116 - - $(-15,780) - - - $69,450
1,845,116
kWh
-
-
MMBtu
$(-15,780)
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$93,377
Cost:
$70,598
$45,877 1,218,837 - - $47,500 - - - $45,877
1,218,837
kWh
-
-
MMBtu
$47,500
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,420
Cost:
$66,806
$12,315 327,187 - - $2,626 - $2,479 - $12,315
327,187
kWh
-
-
MMBtu
$2,626
-
$
$2,479
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,636
Cost:
$8,812
$10,636 282,565 - - - - - - $10,636
282,565
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,356
Cost:
$73,500
$28,356 753,352 - - - - - - $28,356
753,352
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$422,665
Cost:
$378,030
$166,634 4,427,057 $219,206 53,335 $34,346 - $2,479 - $166,634
4,427,057
kWh
$219,206
53,335
MMBtu
$34,346
-
$
$2,479
-
$
TOTAL IMPLEMENTED Savings:
$121,433
Cost:
$146,216
$68,828 1,828,589 - - $50,126 - $2,479 - $68,828
1,828,589
kWh
-
-
MMBtu
$50,126
-
$
$2,479
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost