Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $5,000,000-$10,000,000
# of Employees 300
Plant Area (Sq.Ft.) 71,200
Annual Production 51,000,000 Pieces
Production Hrs. Annual 8,712
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $434,842 7,726,500 kWh $0.06
Electricity Demand $75,991 13,936 kW-months/year $5.45
Electricity Fees $75,499 - $ -
Natural Gas $355,781 70,583 MMBtu $5.04
TOTAL ENERGY COSTS $942,113
RECOMMENDED SAVINGS* $46,981 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,402
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,826
Cost:
$4,986
$5,826 90,856 - - - - $5,826
90,856
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$8,293
Cost:
$800
- - - - $8,293 1,724 -
-
kWh
-
-
kW-months/year
$8,293
1,724
MMBtu
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$8,286
Cost:
$7,123
$3,284 51,231 - - $5,002 1,040 $3,284
51,231
kWh
-
-
kW-months/year
$5,002
1,040
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$24,576
Cost:
$25,575
$23,084 360,007 $1,492 271 - - $23,084
360,007
kWh
$1,492
271
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$46,981
Cost:
$38,484
$32,194 502,094 $1,492 271 $13,295 2,764 $32,194
502,094
kWh
$1,492
271
kW-months/year
$13,295
2,764
MMBtu
TOTAL IMPLEMENTED Savings:
$30,402
Cost:
$30,561
$28,910 450,863 $1,492 271 - - $28,910
450,863
kWh
$1,492
271
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas