IAC Assessment: OR0649
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0649
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product abrasive slurry
NAICS 327910 - Abrasive Product Manufacturing
SIC 3291 - Abrasive Products
Sales $50,000,000-$100,000,000
# of Employees 106
Plant Area (Sq.Ft.) 126,500
Annual Production 3,450 Tons
Production Hrs. Annual 4,160
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $287,203 4,039,521 kWh $0.07
Electricity Demand $46,749 8,712 kW-months/year $5.37
Electricity Fees $15,145 - $ -
Natural Gas $21,767 1,920 MMBtu $11.34
TOTAL ENERGY COSTS $370,864
RECOMMENDED SAVINGS* $72,548 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,340
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$18,604
Cost:
$16,250
$18,604 257,788 - - - - - - - - - - $18,604
257,788
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,484
Cost:
$2,065
$5,497 76,174 $138 63 - - $311 - - - $1,538 - $5,497
76,174
kWh
$138
63
kW-months/year
-
-
MMBtu
$311
-
$
-
-
$
$1,538
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,825
Cost:
-
$2,825 39,142 - - - - - - - - - - $2,825
39,142
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2222 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING Savings:
$5,913
Cost:
$4,455
$15,476 214,438 - - $(-9,563) (-847) - - - - - - $15,476
214,438
kWh
-
-
kW-months/year
$(-9,563)
(-847)
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,536
Cost:
$438
$790 10,948 - - $746 65 - - - - - - $790
10,948
kWh
-
-
kW-months/year
$746
65
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$23,387
Cost:
$10,298
$23,318 323,106 $69 32 - - - - - - - - $23,318
323,106
kWh
$69
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$572
Cost:
$1,000
$544 7,540 $28 13 - - - - - - - - $544
7,540
kWh
$28
13
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,277
Cost:
$2,139
$2,935 40,666 $342 157 - - - - - - - - $2,935
40,666
kWh
$342
157
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,638
Cost:
$1,819
$2,670 37,002 $(-32) (-15) - - - - - - - - $2,670
37,002
kWh
$(-32)
(-15)
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,371
Cost:
$2,065
$1,090 15,109 - - - - - - $183 - $98 - $1,090
15,109
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$183
-
$
$98
-
$
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,941
Cost:
$19,500
- - - - $4,941 429 - - - - - - -
-
kWh
-
-
kW-months/year
$4,941
429
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$72,548
Cost:
$60,029
$73,749 1,021,913 $545 250 $(-3,876) (-353) $311 - $183 - $1,636 - $73,749
1,021,913
kWh
$545
250
kW-months/year
$(-3,876)
(-353)
MMBtu
$311
-
$
$183
-
$
$1,636
-
$
TOTAL IMPLEMENTED Savings:
$18,340
Cost:
$25,523
$11,102 153,842 $448 205 $4,941 429 $311 - - - $1,538 - $11,102
153,842
kWh
$448
205
kW-months/year
$4,941
429
MMBtu
$311
-
$
-
-
$
$1,538
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost