IAC logo
IAC Assessment: OR0651
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0651
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product X-Ray Film
NAICS 325992 - Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 3861 - Photographic Equipment And Supplies
Sales $1,000,000-$5,000,000
# of Employees 350
Plant Area (Sq.Ft.) 237,000
Annual Production 5,028 Pieces
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,421,422 29,748,600 kWh $0.05
Electricity Demand $423,116 49,390 kW-months/year $8.57
Electricity Fees $71,308 - $ -
Natural Gas $1,195,183 244,019 MMBtu $4.90
TOTAL ENERGY COSTS $3,111,029
RECOMMENDED SAVINGS* $422,879 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $329,244
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$58,422
Cost:
$9,638
- - - - $58,422 13,158 - - -
-
kWh
-
-
kW-months/year
$58,422
13,158
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$270,822
Cost:
$210,050
$129,268 2,734,104 $36,529 4,264 - - $105,025 - $129,268
2,734,104
kWh
$36,529
4,264
kW-months/year
-
-
MMBtu
$105,025
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$93,635
Cost:
$132,280
- - - - $93,635 21,089 - - -
-
kWh
-
-
kW-months/year
$93,635
21,089
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$422,879
Cost:
$351,968
$129,268 2,734,104 $36,529 4,264 $152,057 34,247 $105,025 - $129,268
2,734,104
kWh
$36,529
4,264
kW-months/year
$152,057
34,247
MMBtu
$105,025
-
$
TOTAL IMPLEMENTED Savings:
$329,244
Cost:
$219,688
$129,268 2,734,104 $36,529 4,264 $58,422 13,158 $105,025 - $129,268
2,734,104
kWh
$36,529
4,264
kW-months/year
$58,422
13,158
MMBtu
$105,025
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $