IAC logo
IAC Assessment: OR0653
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0653
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Fruit Puree
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 110
Plant Area (Sq.Ft.) 65,340
Annual Production 6,500 Thousand Gallons
Production Hrs. Annual 6,336
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $341,410 6,027,628 kWh $0.06
Electricity Demand $171,292 19,206 kW-months/year $8.92
Electricity Fees $46,188 - $ -
Natural Gas $734,781 154,885 MMBtu $4.74
TOTAL ENERGY COSTS $1,293,671
RECOMMENDED SAVINGS* $165,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Water Consumption
$ kWh $ kW-months/year $ MMBtu $ gal $ Tgal
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$118,419
Cost:
$40,792
- - - - $46,488 10,308 $19,340 7,512,987 $52,591 - -
-
kWh
-
-
kW-months/year
$46,488
10,308
MMBtu
$19,340
7,512,987
gal
$52,591
-
Tgal
02: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$36,536
Cost:
$30,728
- - - - $36,536 8,101 - - - - -
-
kWh
-
-
kW-months/year
$36,536
8,101
MMBtu
-
-
gal
-
-
Tgal
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,897
Cost:
$4,580
- - - - $3,897 864 - - - - -
-
kWh
-
-
kW-months/year
$3,897
864
MMBtu
-
-
gal
-
-
Tgal
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$611
Cost:
$1,058
$611 10,562 - - - - - - - - $611
10,562
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
Tgal
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$4,262
Cost:
$15,398
$2,915 50,409 $1,347 151 - - - - - - $2,915
50,409
kWh
$1,347
151
kW-months/year
-
-
MMBtu
-
-
gal
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,625
Cost:
$1,000
$1,606 29,373 $19 2 - - - - - - $1,606
29,373
kWh
$19
2
kW-months/year
-
-
MMBtu
-
-
gal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$165,350
Cost:
$93,556
$5,132 90,344 $1,366 153 $86,921 19,273 $19,340 7,512,987 $52,591 - $5,132
90,344
kWh
$1,366
153
kW-months/year
$86,921
19,273
MMBtu
$19,340
7,512,987
gal
$52,591
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ Tgal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Water Consumption