IAC Assessment: OR0654
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0654
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Packaged Seafood
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $100,000,000-$500,000,000
# of Employees 34
Plant Area (Sq.Ft.) 28,000
Annual Production 28,000,000 Pieces
Production Hrs. Annual 7,800
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,719 4,122,840 kWh $0.05
Electricity Demand $91,302 14,444 kW-months/year $6.32
Electricity Fees $19,982 - $ -
Natural Gas $4,905 447 MMBtu $10.97
TOTAL ENERGY COSTS $384,825
RECOMMENDED SAVINGS* $1,217,392 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,210,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,067,158
Cost:
$300,000
- - - - - - $599,158 - $468,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$599,158
-
$
$468,000
-
%
02: 4.426 MODIFY WORKLOAD Savings:
$23,248
Cost:
$10,000
$(-672) (-12,480) - - $23,920 - - - - - $(-672)
(-12,480)
kWh
-
-
kW-months/year
$23,920
-
$
-
-
$
-
-
%
03: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$115,650
Cost:
$50,000
$(-9,150) (-124,800) - - $124,800 - - - - - $(-9,150)
(-124,800)
kWh
-
-
kW-months/year
$124,800
-
$
-
-
$
-
-
%
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,588
Cost:
$5,986
$2,588 48,066 - - - - - - - - $2,588
48,066
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,722
Cost:
$60,000
- - - - $6,722 - - - - - -
-
kWh
-
-
kW-months/year
$6,722
-
$
-
-
$
-
-
%
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$2,026
Cost:
$9,325
$1,944 36,097 $82 12 - - - - - - $1,944
36,097
kWh
$82
12
kW-months/year
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,217,392
Cost:
$435,311
$(-5,290) (-53,117) $82 12 $155,442 - $599,158 - $468,000 - $(-5,290)
(-53,117)
kWh
$82
12
kW-months/year
$155,442
-
$
$599,158
-
$
$468,000
-
%
TOTAL IMPLEMENTED Savings:
$1,210,670
Cost:
$375,311
$(-5,290) (-53,117) $82 12 $148,720 - $599,158 - $468,000 - $(-5,290)
(-53,117)
kWh
$82
12
kW-months/year
$148,720
-
$
$599,158
-
$
$468,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production