Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2015 |
Principal Product | Frozen Fish |
NAICS | 311710 - Seafood Product Preparation and Packaging |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 45,000 |
Annual Production | 9,000,000 Pounds |
Production Hrs. Annual | 8,750 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,353 | 586,040 | kWh | $0.08 |
Electricity Demand | $13,385 | 2,098 | kW-months/year | $6.38 |
Natural Gas | $13,661 | 1,361 | MMBtu | $10.04 |
TOTAL ENERGY COSTS | $72,399 | |||
RECOMMENDED SAVINGS* | $147,835 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $139,593 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $135,000 Cost: $250,000 |
- | - | - | - | - | - | $135,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
$135,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,310 Cost: $8,500 |
$2,344 | 24,751 | $80 | 13 | $886 | - | - | - |
$2,344 24,751 kWh |
$80 13 kW-months/year |
$886 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,283 Cost: $1,500 |
$1,283 | 13,547 | - | - | - | - | - | - |
$1,283 13,547 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $8,242 Cost: $54,525 |
$8,182 | 86,394 | $60 | 9 | - | - | - | - |
$8,182 86,394 kWh |
$60 9 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $147,835 Cost: $314,525 |
$11,809 | 124,692 | $140 | 22 | $886 | - | $135,000 | - | $11,809 124,692 kWh |
$140 22 kW-months/year |
$886 - $ |
$135,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $139,593 Cost: $260,000 |
$3,627 | 38,298 | $80 | 13 | $886 | - | $135,000 | - | $3,627 38,298 kWh |
$80 13 kW-months/year |
$886 - $ |
$135,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product |