IAC logo
IAC Assessment: OR0662
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0662
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Dimensional Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 130
Plant Area (Sq.Ft.) 150,000
Annual Production 32,175,000 Units
Production Hrs. Annual 7,020
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $899,745 18,070,000 kWh $0.05
Electricity Demand $377,429 44,333 kW-months/year $8.51
Electricity Fees $50,953 - $ -
TOTAL ENERGY COSTS $1,328,127
RECOMMENDED SAVINGS* $89,511 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$41,305
Cost:
$102,204
$5,330 111,184 $2,615 304 $32,000 - - - $1,360 - $5,330
111,184
kWh
$2,615
304
kW-months/year
$32,000
-
$
-
-
$
$1,360
-
%
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$15,820
Cost:
$2,500
- - - - $(-500) - - - $16,320 - -
-
kWh
-
-
kW-months/year
$(-500)
-
$
-
-
$
$16,320
-
%
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,567
Cost:
-
$3,684 76,855 $3,883 452 - - - - - - $3,684
76,855
kWh
$3,883
452
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$2,998
Cost:
$864
$2,256 34,936 - - $742 - - - - - $2,256
34,936
kWh
-
-
kW-months/year
$742
-
$
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,683
Cost:
$6,683
$5,475 114,212 $208 24 - - - - - - $5,475
114,212
kWh
$208
24
kW-months/year
-
-
$
-
-
$
-
-
%
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,080
Cost:
$302
$1,080 22,538 - - - - - - - - $1,080
22,538
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,058
Cost:
$67,152
$12,184 254,157 $4,266 497 $2,824 - $(-4,216) - - - $12,184
254,157
kWh
$4,266
497
kW-months/year
$2,824
-
$
$(-4,216)
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$89,511
Cost:
$179,705
$30,009 613,882 $10,972 1,277 $35,066 - $(-4,216) - $17,680 - $30,009
613,882
kWh
$10,972
1,277
kW-months/year
$35,066
-
$
$(-4,216)
-
$
$17,680
-
%
TOTAL IMPLEMENTED Savings:
$5,683
Cost:
$6,683
$5,475 114,212 $208 24 - - - - - - $5,475
114,212
kWh
$208
24
kW-months/year
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Increase in Production