IAC Assessment: OR0664
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Hardboards
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $5,000,000-$10,000,000
# of Employees 191
Plant Area (Sq.Ft.) 2,744,280
Annual Production 1,400,000 Pieces
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,758,138 31,061,180 kWh $0.06
Electricity Demand $232,961 72,540 kW-months/year $3.21
Electricity Fees $129,164 - $ -
Wood $414,656 251,073 MMBtu $1.65
TOTAL ENERGY COSTS $2,534,919
RECOMMENDED SAVINGS* $91,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,507
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$2,739
Cost:
-
$2,242 33,224 - - - - - - $497 - - - $2,242
33,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$497
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,310
Cost:
$2,584
- - - - $1,310 556 - - - - - - -
-
kWh
-
-
kW-months/year
$1,310
556
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$12,507
Cost:
$32,393
$11,028 187,450 $1,193 360 - - $693 - - - $(-407) - $11,028
187,450
kWh
$1,193
360
kW-months/year
-
-
MMBtu
$693
-
$
-
-
$
$(-407)
-
$
04: 2.4325 UPGRADE CONVEYORS Savings:
$74,609
Cost:
$242,718
$66,035 1,122,475 $8,574 2,590 - - - - - - - - $66,035
1,122,475
kWh
$8,574
2,590
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,165
Cost:
$277,695
$79,305 1,343,149 $9,767 2,950 $1,310 556 $693 - $497 - $(-407) - $79,305
1,343,149
kWh
$9,767
2,950
kW-months/year
$1,310
556
MMBtu
$693
-
$
$497
-
$
$(-407)
-
$
TOTAL IMPLEMENTED Savings:
$12,507
Cost:
$32,393
$11,028 187,450 $1,193 360 - - $693 - - - $(-407) - $11,028
187,450
kWh
$1,193
360
kW-months/year
-
-
MMBtu
$693
-
$
-
-
$
$(-407)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Wood Personnel Changes Administrative Changes Primary Raw Material